High speed of journeys, model of heavy cutting of the special-purpose digital-controlled machine cnc digital-controlled processing centre plant
HTML1380 processing centre parameter: HTML1580 processing centre parameter
Tm1380 heavy vertical processing centre optical machine:

Daily maintenance methods at heavy htm1380 processing centres
PressMaintenance after day shift, weekly, monthly, quarterlyDivision, concise and practical, suitable for guidance to customers on equipment maintenance。
I. Daily maintenance (pre- and post- shift operators must do)
Lubrication system checkCheck the lubricant oil table before it starts, below the tic line for the timely insertion of the special lubricant; confirm that the automatic lubrication pump is normal and ensures continuous flow of the tracks and wire bars to prevent dry grindings。
Cutting fluid(c) observe the level, concentration and deformity of the cutting fluid; clear the tanks of oil and iron crumbs to prevent the jamming of pumps; and check whether the nozzle is open and the nozzle is blocked。
Machine bed cleaningProcessing the cleanup workstation, t tanks, remaining iron scraps in the shield; cleaning the outer surface of the machine bed and not allowing the scraps, cutting fluids to accumulate on the workstation and the trajectory for long periods。
Gas source and pressure checkCheck the air pressure (0. 6 ~ 0. 8 mpa) and release the filters to accumulate water; check whether the vault, main axle blow function is normal。
On-board airway inspectionRun three axes at low speed when the engine is turned on to observe any noise or vibration; check the validity of the stop and limit switches。
Ii. Weekly maintenance
Cleaning up of iron crumbs within the crumbs to prevent card delay
Cleaning of the main axle end, skeletal cones, cleaning, and checking for bumps and sticky iron crumbs
(b) checking the graft panels and, if damaged, replacing them in a timely manner to prevent the scraps from entering the interior of the tracks
Check for looseness of rigid screws, working table presses, knife vaults
Clean up electrical cabinets with heat fan filters to prevent dissipation from dust piles。
Iii. Monthly maintenance
(b) checking the oil in the lubricant tank, and replacing the guided oil with the fluid blackout and impurities
Check the wire bars, tracks and tracks for wear and tear, and see if the silk bars are broken
(a) maintenance of the knife bank: cleaning of the kite, examination of the clips for tightness, adding lubricant to the knife bank cam and chain
Check machine bed levels and fine-tune foot bolts if necessary
Check the cables, whether they are ageing, broken or loosed。
Quarterly maintenance (3 months)
(a) the complete replacement of cutting fluids, the cleaning of water tanks and the removal of oily sediments
(a) maintenance of the main axis: inspection of temperature rises on the main axis, jumps on the main axis and performance of the main axis bearings
Three-axis cord bearings, joint axes, and lubricant as required
Full calibration of machine-bed positioning accuracy, repeat positioning accuracy
Cleaning of air tanks, dryers and checking of air-activated component seals。
Long-term shutdown maintenance (leave/cut-off)
Workstations, tracks, metal naked surface coating of stainproof oil
(b) dry cutting of liquid tank fluids to avoid corrosion
Shut down the gas source and cut off the electricity; air transport air transports air traffic every 7-10 days for 15-20 minutes to protect electrical components from tide。
Priorities
It is strictly forbidden to leave iron crumbs, groceries on the rail surface, t-type tanks, and the heavy-load processing centre workstation is vulnerable to erosion of surface accuracy once it is squeezed by iron crumbs
The use of high-pressure water guns for direct washing of electrical cabinets and operating panels is prohibited
(b) strict use of recommended lubricant and cutting fluids at the plant, and the mixing of oil can cause damage to the track and main axis
The sound, the alarm, the first stop, do not force them to continue。
The heavy htm 1380 processing centre produces a visual image: