Hello, welcome toPeanut Shell B2B Foreign Trade Network_Professional B2B E-commerce Platform_Free B2B Information Publishing Network!
18951535724
  •  
     

    The asphalt floor is new, the cold is changed, the new suit is replaced, the package works are done

    Price ¥75.00Compare
    Shipping ShandongQingdao
    Shipping Free Shipping
    Sales Volume None
    Reviews Already 0 reviews
    Popularity Already 2 followers
    Quantity
    +-
    Stock10000Square metres
     
    Contact Us
    Follow0

    Qingdao chang-hong-seok landscape engineering ltd

    企业会员No.1Year
    ProfileUncertified
    DepositUnpaid
    Brand
    Aoshima is a great man
    Product characteristics
    It's beautiful and persistent
    Retardability
    Satisfactory
    Flatness
    Smooth
    Specifications
    2mm-3mm thickness
    Feature services
    Free sample
    Scope of use
    Municipal roads, parks, walkways
    Scope of use
    Asphalt, fluid concrete, cement, plastics
    Sellable land
    National
    Colour
    Colour pattern customizable
    Product introductionProduct introductionProduct information
    • Product category: ground-based adaptation

    • Fortress: chang qiang qiang

    • Ground type: asphalt land

    • Materials: polyurethane

    • Colour: colour custom colour

    • Work: packages

    • Price: area colour scheme pricing

    Product actualThe product making plansMaterials

    Alternating paints for oily roads

    The main ingredient is polyurethane material, which allows for colour

    SaturationHigher。

    For concrete roads, asphalt roads, and pedestrian roads

    ProvinceBoardCement, concrete, etc

    ChangeColourConstruction。


    Characteristics

           The construction is less costly than other forms of coloured road-storage construction, is simple in process and has a beautiful and durable colour cover. There has also been a significant increase in the adhesiveness, intensity, durability and resistance to the surface of the road. It's not easy to get off, get up and fade。

     

    Process

    It's in cold, high temperatures

    We can do the same thing

    You can walk for hours, you can open for 24 hours

    Transport, if construction temperature is below 0°c

    Due extension of traffic opening hours at 0-35 temperatures

    The construction is suitable between degrees。

     

    Construction

     The surfaces of the roads to be redone will be cleaned and completely dry before they are re-engineered and, in case of loose collapses and so on, the surfaces should be repaired before construction is completed and the ground is kept dry without water。


    Product detailsProduct detail drawingConstruction plansImpact chartImpact chartImpact chart


    Product useProduct useMain camp project


    Purchase instructions01 pre-construction preparation

    1. The new black asphalt layer requires finer asphalt flatting, pressure, cooling.

    2. Old asphalt surfaces need to be patched, washed, pre-spray interfaced。

    Facilities such as electricity and water supply, transport roads, mixing and stacking of sites, shed stores and fire protection should be addressed prior to construction。

    02 construction process

    1. Match and mix as required。

    2. Contamination-proof treatment in accordance with road design requirements。

    3. The modified high-molecular emulsion is proportional to the coloured powder and is fully mixed with a high-speed mixer of three minutes and three minutes... And two minutes for backup。

    4. Disturb the mix into the sprayer

    5. Colored coating of polymers after drying (2 ~ 4 hours)。

    03 about colors

    Colour card selection, with regard to faded — previous years were not coloured, while the road surface, after several years of use, was tardled with car wheels and the environment

    The asphalt in the mix will age and the colours will become darker, as the adhesive binds fall, the surface of the surface will be loose, the pits

    It's obvious, like light color, so it can also be colored with a colored surfaceSpray complementary。

    04 about the customer service

    Contacts are on the phone. We can wire the details. Thank you

    05 on sale

    The company has after-sales personnel, which are repaired free of charge during maintenance, except for non-quality issues。

    06 on construction

    Consultations with a on construction time。


    公司介绍
    公司名称
    Qingdao chang-hong-seok landscape engineering ltd
    统一社会信用代码
    成立日期
    2025
    企业类型
    Enterprise
    注册资本
    200万(元)
    联系方式
    15969835221
    注册地址
    Unfilled
    经营范围
    General projects: construction of the greening of the garden, construction of the stone works, construction of the metal doors and windows, construction of the facilities for the sports field, sale of construction materials, sale of architectural and deco
    公司联系方式
    姓名
    Lee jianyong
    手机
    15969835221
    部门
    销售部
    电话
    15969835221
    传真
    15969835221
    邮件
    QQ
    346655709
    Skype
    阿里旺旺
    价格说明

    价格:向品在花生壳b2b外贸信息平台的展示标价,县体的成文价情可能因向品参加活动考情况发生变化,也可能随者购买数量不同或所选规信不同而发生变化,如用户与向家线下达成协议,以线下协议的结算价格为准,如用户在花生壳b2b外贸信息平台上完成线上购买,则最终以订单结算页价格为准。

    抢购价:商品参与营销活动的活动价格,也可能随着购买数量不同或所选规格不同而发生变化,最终以订单结算页价格为准。

    特别提示:商品详情页中(含主图)以文字或者图片形式标注的抢购价等价格可能是在特定活动时段下的价格,商品的具体价格以订单结算页价格为准或言是您与商家联系后协商达成的实际成交价格为准;如您发现活动商品价格或活动信息有异常,建议购买前先咨询商家。

    ReportFavorite 0