Annual equipment maintenance schedule of the ministry of hotel management and engineering - group chain hotel management
Ministry of engineering annual equipment maintenance schedule
√ indicates that it will be implemented during the month and that, once approved, the plan forms will be strictly enforced and filed with the security records.
The content, the name of the device, the content of the protection, the duration of the protection plan, the month in which it was implemented
Serial number 1 2 3 4 5 6 7 8 9 10 11 12
1 fire host cleaning, battery testing, backway testing, checking input voltage quarterly
2 walk street handprint, smoke senses, probes, alarms
8 walk street fire curtain gate resize speed break, chain oil, rocking electric insulation, curtain cleaning, secure line for six months
13 walk street fire broadcast system cleaning, dusting, aligning equivalent output, line checking, 6 months
14 walk street fire communication, test all fire equipment connections, program logic, six months
3 the mall area a hand report, spy, alarm, check the equipment functionality, check the probes, six months

13 shopping centre area a fire broadcasting system cleaning, dusting, calibrating electrical output, tight circuit inspection, six months
14 shopping center area a fire communication test of each fire-fighting device connection, program logic, six months
9 fire volkswagen zone a, adjust speed breakpoints, chain oil, rocking electric insulation, curtain sweeps, line secure for six months
4 cell b handbills, scouts, alarms
14 shopping center area b fire communication tests of each fire facility connection, program logic, six months
13 shopping centre b fire broadcasting system cleaning, dusting, aligning equivalent output, secured lines, 6 months
9 firecracker door in area b of the mall, re-engineered speed limit, chain oil, rocking electric insulation, curtain cleaning, tight lines, six months
7 area c parking reports, cameras, alarms
Sector c parking lot fire-proof curtains, reset speed limits, chain oil, rocking electrical insulation, curtain cleaning, secure lines, six months
14 area c parking lot fire
Fire broadcasting system, parking area c. Cleaning, dusting, calibrating electrical output, cordon check

5 de zone journal, p. O. D., alarm
14 market center d-zone fire link, test each fire-fighting device connection, program logic, six months
13 clearing, dusting, calibrating electrical output, cordon check, six months
12 fire curtain gate, d-zone, re-integrate speed limits, chain oil, turbo insulation, curtain cleaning, line tight, six months
6 concourse reports, probes, alarms
13 acoustic fire broadcasting system cleaning, dusting, calibrating electrical output, cord checking, six months
14 hydraulic fire combination tests of each fire-fighting device connection, program logic, six months
15 firebox stabilize the screws of the various elements in the boxes, and tighten the input output end platoons; there is no aroma in the boxes and there is no heat in the transformers; check the equipment numbering is correct; check the circuits of the powerful boxes controlled by the modules in the weak boxes; clean the weak boxes that are maintained
16 ddc boxes stabilize screws of the various elements in the boxes, tighten input end-lines; internal infatuation and overheat in the transformers; check the equipment numbers; check the circuits of the power cells controlled by the modules in the weak boxes; clean the weak boxes that are maintained
17 ensorption boxes. Stabilize screws of the various elements in the boxes, and tighten input output sub-teams; internal infatuation and overheating of transformers; check the correct equipment number; check the circuits of the power cells controlled by the modules in the weak boxes; clean up the weak boxes maintained
18 remote retrieval box stabilization of screws of the components in the boxes, tight input of output end-lines; presence of odor and overheat in the transformers; checking of equipment numbers; checking of the circuits of the power cells controlled by the modules in the weak boxes; cleaning of the weak boxes maintained; quarterly √

19 network cabinets stabilize end-lines, check network lines, telephone lines, clear dust inside and outside the cabinets, and bind lines. Quarterly
The central control room inspects all building systems, security systems, and door-to-door systems
21 weak inter-electrical inspection requires that each equipment box check the operation of the equipment while checking the hygiene situation
22 cameras, correct angles for on-site cameras, wipe protective shields, maintain cameras, wipe paper with lenses, clean quarterly √ √
Twenty-three, double forensics detector, field-test with the central control room, check for alert sensitivity
24 air-conditioning room inspection, inspection of the ddc boxes in the aircraft room, inspection of the operation of the weak electrical equipment in the aircraft units, quarterly inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection, inspection
25 air conditioner units tested for weak electrical equipment
26 maintenance of security-control equipment