Share EncyclopediaHome EncyclopediaCategories Switch Channel

Air-conditioning equipment repair and maintenance contract

2026-06-24 05:03820NameNetworking

Air-conditioning equipment repair and maintenance contract

1 a side of the contract for the repair and maintenance of air-conditioning equipment: b side: this contract is concluded after full consultation between a and b parties, in accordance with the relevant regulations of the law of the people's republic of china on contracts, taking into account the specific circumstances of the project, in order that the parties can comply with it and successfully complete the project. 1. A commission to b for the repair and maintenance of air conditioners: 1. Project name: b performs annual maintenance and emergency repair of equipment for the a-team to bring its equipment up to normal standards. 2. B to conduct annual maintenance service coverage for equipment on site as follows: 1) b to perform crew inspection for a during the period of the agreement, as follows: l to inspect the air exhaust pressure of the aircrewl to test the compressor, pump operation voltage and currentl to revise the aircrew safety and control unitl to inspect the noise and vibration of the aircrew,1 b to perform full crew inspection for a twice a year during the period of the agreement (before the winter and summer start-up of the aircraft) as follows: l in addition to the above-mentioned inspection, b will provide emergency failure maintenance services, which will be addressed by telephone, and, if it is not possible to resolve its arrival at the site within 5-12 hours of receiving a telephone call from a, for maintenance treatment of the cause of the failure. 2l b is responsible only for maintaining the maintenance project, and the cost of damaged equipment and materials is borne by a (provision of required spare parts at a preferential price) and b provides technical guidance free of charge. 2. The obligation of a: to provide personnel to coordinate the problems encountered by b during maintenance and to make payments in strict compliance with the agreement. Iii. Total contract price and scope: 1. In view of the fact that party a of the maintenance services provided by party b agrees to pay a capital sum: 2. The payment shall be made in cash or by cheque for 80 per cent of the annual maintenance fee as from the date of signature of the contract, and 20 per cent of the other maintenance shall be paid after acceptance; 3. This contract shall enter into force on the date of its signature and shall run for one year from the date of its signature; it shall be settled by mutual agreement if the costs are borne by a as a result of irresistible external natural damage or the improper operation of a. This contract, of two originals each, shall enter into force on signature. A: b: representative: representative:

Like 0
Report
Favorite 0
Tip 0
Comment 0
Share 3
MoreRelated Comments
No comments yet, be the first to comment
Lcd tv looks back 10 years: how to kill plasma
1 lcd tv 10 year review and outlookFor 80 or even 90 years later, the initial impression of television is that the cathode cathode cathode (crt) television, the screen on the sphere (later changed to pure plane), the thick border and the big buttocks seem to be a bit of a silent taste today. Interestingly, it was the relative integrity of the users of this age group who had experienced the development of lcd tv over the past 10 years, and we went

0评论2026-08-11196