Share EncyclopediaHome EncyclopediaCategories Switch Channel

Model contract for the repair and maintenance of construction firefighting facilities

2026-07-31 01:121240NameNetworking

Statutory representative: statutory representative: delegated agent: delegated agent:

Model contract for the repair and maintenance of construction firefighting facilities

A:b:

Article ii: subjects of contract

(names of body works and reports received by the public security fire agency or already operational)

Construction of firefighting facilities:)

Fire alarm system mouth auto-spray fire suppression system

Fire-proof separation of mouth-to-mouth cooling system foam-to-mouth gas-to-fire-fighting system

Emergency lighting at the mouth of the system and fire communication equipment at the mouth of the evacuation instruction system

Other fire-fighting facilities at mouth moving fire-fighting system entrances

Note: in the selected object box, no。

Article iii: objectives of contract execution

Contract scope based on national and local technical specifications for building fire-fighting facilities in

(c) repair and maintenance to ensure its proper functioning。

Article 4: responsibilities of the parties

A. Liability: provision of a full set of construction accommodations approved by the public security fire agency within the scope of the contract

Completion of drawings and legal clearance of all fire-fighting facilities; assumed due to the subject of the contract

Quality problems or maintenance costs valued at over $100 during use, and metaphones annex

Replacement costs first (except for one-year warranty period); responsible for day-to-day running of fire-fighting facility systems

B. Liability: in accordance with national and local regulations and technical regulations governing the construction of fire-fighting facilities

Pang, provide repair and maintenance of fire-fighting facilities within the scope of the contract for a

Frequent failure (except for factors such as resistance to natural disasters and man-made damage); scope of contract internal

Fire-fighting facilities, in addition to regular maintenance, following notification of failure of fire-fighting facilities

Visits to maintenance should take place within 24 hours; contract coverage should be reported regularly to a and fire agencies

The operation of internal fire-fighting facilities

Shared responsibility: compliance with and enforcement of national and local laws and regulations relating to the construction of fire-fighting facilities

Technical specifications; common agreement and implementation of the code of maintenance for the repair and maintenance of building fire facilities; regular co-location

Also report to and be supervised by the public security fire service on the operation of the persons under contract。

Article v: duration of contract execution

This contract shall run from the month of january to the month of january。

Article 6: contract amounts, payment modalities

Contract amount: annual fire repair and maintenance costs per person (dn$ capital)

Method of payment: if this contract enters into force with the signature of both parties, the date of entry into force of this contract shall be

Payment of % ($. 00) to b within the first week of the first month of the year for maintenance for the current year;

In the first week of the seventh month of the first year of the contract year, the first party will then pay the second party the original

Additional annual maintenance costs per cent ($. 00); contract year 2 and year 3

Such push。

Cash-for-transmittance checks, bank receipts and wire transfers

Article 7: liability for non-compliance

The parties shall not terminate the contract without cause or, in case of default, by the defaulting party in accordance with the non-performance portion. ]

50 per cent of the contract amount was paid to the other party for breach of contract

3 per cent of the total amount of the contract if party a fails to meet the time limits stipulated in the contract

Payment of late payment to b; if b fails to perform maintenance duties as contracted, as contracted

A total of 3 per cent of the total amount was paid to party a in default。

Article 8: other

This contract shall be signed by the legal persons of parties a and b or their delegated agents. ]

Effect. Four copies of this contract, two each of which shall have the same effect

A copy (print) of the case was also filed with the public security fire agency。

This contract has not been settled by mutual agreement。

Article 9: signature by the parties

A: b:

Representative:

Year h:

Model contract for the construction and maintenance of firefighting facilities

Contract number:

A: high school seal

B: engineering ltd

Day

In accordance with national and local regulations and technical regulations for building fire-fighting facilities

The barrier-built fire facility is operational and the contract for maintenance is signed。

Article i: parties to the contract

A: secondary

B: ltd

Article ii: subjects of contract

Zen (name of body works and registration by the public security fire agency of the a-face or already operational)

Fire-fighting facilities:)

The fire alarm system mouths automatically spray the fire suppression system mouths

The cooling system mouth foam fire suppression system mouth gas suppression system mouth fire separation system mouth protection against smoke

Mobile fire suppression system for the system-door emergency lighting and evacuation instruction system-door firefighting communications equipment mouth

Other fire-fighting facilities

Note: in the box for the selected object, click " , without "

Article iii: objectives of contract execution

Contract scope based on national and local technical specifications for building fire facilities in

Maintenance of firefighting equipment

(c) repair and maintenance to ensure its proper functioning。

Article 4: responsibilities of the parties

A. Responsibility for providing all construction facilities under contract approved by the public security fire agency

Legally qualified completed drawings and all firefighting facilities; assumed due to the subject of the contract

Quality problems or maintenance costs of over $100 in the course of use, as well as metalloids annex

Replacement costs, first (except for one-year warranty period); day-to-day running of fire facility systems

(b) discovery of problems and immediate notification to b and provision of necessary work for b to perform this contract

P; b is paid for maintenance in the amount and manner specified in the contract。

B. Liability: in accordance with national and local regulations and technical regulations governing the construction of fire-fighting facilities

Pang, maintain and maintain fire-fighting facilities under contract provided by a

Frequent failure (except for such factors as resistible natural disasters and man-made damage); scope of contract internal

Fire-fighting facilities, in addition to regular maintenance, after receiving notification of failure of fire-fighting facilities

Visits to maintenance should take place within 24 hours; contract coverage should be reported regularly to a and fire agencies

(b) the operation of fire-fighting facilities

Co-responsibility: compliance with and enforcement of national and local laws and regulations relating to the construction of fire-fighting facilities

Technical specifications; common agreement and implementation of the code of maintenance for construction of fire facilities; regular co-location

The performance of the persons under the contract is also reported to and supervised by the public security fire service。

Article v: duration of contract execution

This contract covers the period from to

Day。

Article 6: contract amounts, payment modalities

Total amount of contract: maintenance of fire-fighting system under this contract, capitalized rmb: wu wan

It's not like i'm going to be able to do this. Retention under contract。

Method of payment: this contract enters into force for both parties at the first year of the contract

Within the first week of july, 50 per cent (2925. 00) of the current year's maintenance costs were paid to b

A further 50 per cent (2925. 00) was paid to b in the first week of the seventh month of the following yearo

Cash-for-transmittance checks, bank receipts and wire transfers

Article 7: liability for non-compliance

Parties shall not terminate the contract without cause, if the breach occurs, by the defaulting party in accordance with the non-performance portion. ]

5096 of the contract amount paid to the other party for breach of contract

3 per cent of the total amount of the contract if party a fails to meet the time limits stipulated in the contract

Payment of late payment to b; if b fails to perform maintenance duties as contracted

The amount of 3 per cent was paid to party a in default。

Article 8: other

(a) this contract shall enter into force on signature and seal on behalf of or on behalf of a legal person of both parties;

(a) each of these contracts shall have the same effect in three copies as each of a and b

This contract shall be reported to the public security fire agency for filing (copy)o

Maintenance of firefighting equipment

This contract has not been settled by mutual agreement。

Article 9: signature by the parties

A: b:

Representative:

Time:

Model contract for repair and maintenance of construction firefighting facilities4

Contract number:

Place of signature:

Signature:

A (trust, depositor):

Party b (underlay, underwriter):

Under the civil code, the fire law of the people's republic of china and the mountain

The east province fire regulations are subject to the following agreements, negotiated on a case-by-case basis。

Name of maintenance building:

Ii. Scope of maintenance:

Party b is responsible for building fire-fighting facilities in the following buildings:

Repair。

1. Construction of fire separation and safe evacuation facilities

2. A fire alarm system

3. Fire-fighting water facilities

4. Dismantling systems

5. Fire artillery systems

6. Automatic water-jet firefighting systems

7. Gas fire suppression systems

8. A water spray automatic fire suppression system

Foam-fighting systems

10. Smoke-resistant, smoke-smoking facilities

11. Fire-fighting electrical and communications facilities

12. Fire elevators

13. Dry powder fire-fighting facilities

14. Mobile fire extinguishers

15. Other facilities. Details (see list of building fire facilities)

Iii. Duration of maintenance:

From day to month

Time. If both parties wish to extend the maintenance period before the expiry date

Maintenance period

Like 0
Report
Favorite 0
Tip 0
Comment 0
Share 0
MoreRelated Comments
No comments yet, be the first to comment