1 , 1/ 4 precision air conditioning maintenance contract a: b: in accordance with the relevant laws and regulations of the people's republic of china, such as the contract law, and on the basis of the principle of equality and voluntariness, the parties reached agreement on the following: first contract profile: name of contract: xxxxxxx contract profile: (11) location of contract: (2) total contract price: $ (in capital:) (3. 3) maintenance date: to (4. 4) method of payment: a lump sum payment for maintenance within seven days of the date of the contract. The second maintenance requirement requires maintenance personnel to comply with the relevant regime on the one hand for staff working on the ground and, in the case of special work, to prepare for safety protection, with any consequences to be borne by the other. Quality of maintenance and quality of content maintenance: strictly in accordance with the maintenance manual for air conditioning systems

Maintenance contracts

2. Air conditioning maintenance. Maintenance quality completes maintenance projects in accordance with national and industry standards and a requirements. This is as follows: b is regularly provided to a four times a year for interior filtering and two times an outdoor machine cleaning service. (1. 1) air-conditioning outdoors: cleaning condensers with air-conditioning special detergents, electrical circuit security checks, current testing. (2. 2) air-conditioning indoor machines: filtration network replacement, evaporation and drainage pipes and drainage pumps, etc. Article iv service definition (11) this contract relates only to cleaning and maintenance of air-conditioning indoors and exteriors. If the air conditioner fails during the maintenance period, party b shall report to the head of party a after inspection for confirmation of maintenance. The replacement faulty spare parts are submitted for inspection on the a side, and spare parts for maintenance are charged only at the cost of the product, which is detailed in the schedule of spare parts prices. 2/ 4(2. 2) the cost of the services referred to by party b hereto does not include the costs of services due to human capacity

Maintenance contracts

3. The cost of labour, spare parts and materials, etc., for repairing the damage to equipment, such as for reasons of cause, or other force majeure; and the costs incurred for reasons other than modifications, replacements and movements of equipment on the one hand, involving the cost being charged separately to a at the best price in b. (3) party b shall not assume any responsibility for the quality of spare parts purchased by party a itself. (4. 4) until the maintenance contract is signed, the air conditioner equipment must be normal and, in the case of a bad machine, the cost of repair is additional. Article 5 (a) (a) (b) (a) (a) (i) (a) (a) (a) (a) (a) (a) (a) (a) (a) (a) (a) (a) (a) (a) (a) (a) (a) (b) (a) (a) (a) (a) (a) (a) (a) (a) (a) (a) (a) (a) (a) (a) (a) (b) (a)) (a) (a) (a) (a)) (a)) (a)) (a) (a)) (a)) (a) (a)) (a) (a)) (a) (a) (a) (a) (a) is) and (b) (a) (a) (a) (a) (a) (a) (a) (a) is) and (a) (a) (a) and (a) (a) (a) (a) (a) (a) (, (a) (a) 2) to be monitored by a to ensure that services are in place. (3) the head of party b shall have overall responsibility for the management of the construction site, shall be responsible for the safety of the equipment and personnel at the construction site and shall comply with the relevant provisions. 4) the replacement faulty spare parts are submitted for inspection to the a-side. 5 5)

A maintenance order must be issued for each maintenance and confirmed by the signature of the personnel of the information centre in a. (ii) a responsibility: 1) to facilitate access to air-conditioning protection for b. 2) provide complete ac technical information. During the service period, when air conditioners fail to operate (e. G., air mediation, controller failure, high temperature alert, etc.), our company will send specialized technical engineers to the site within 8 or 8 hours, and spare parts air filters, detergents, high pressure washing machines will be provided free of charge. Article 7. The contract is terminated by a. A party is entitled to terminate the contract by giving notice in writing to b: 1 and a party providing proof of a change of title. 2. The protection project did not meet the deadline, performed fully and qualitatively for more than one season and was identified as having problems. 3. Party a was unable to perform due to force majeure。

Maintenance contracts

5. B. B. Party b has the right to terminate the contract in writing by notice of a change of business in the following circumstances: 2. Party b is unable to perform due to force majeure. 3/43, if a is in bankruptcy, liquidation (other than consolidation or reorganization) or failure to pay the debts payable. Article 8. This contract shall enter into force on the date on which the parties sign the seal. Article ix. This contract is divided between the parties. They shall be established by virtue of their signature and shall have force of law and equal force of law. A: (stamp) b: (stamp): (stamp) statutory representative: unit of the statutory representative: (or commissioning agent) (or commissioning agent) 1 air filter to replace 1 set of 3 2 flion 20 kg1 bottles with 1 set of 4 heating pipe plants 1 set of 6 dry filter plants 1 set of 7 drain pumps 1 manual, catering and road fees 1 time