Project overview and scope of procurement

Project description project name: 1. 1 ning chou bridge maintenance strengthening design project 2026. 1. 2 buyer: jiang suning ceion highway co. Ltd. 1. 3 procurement agent: huai antsawa engineering consulting ltd. 1. 4 funding availability: implemented. 1. 5 project overview: ning chou covers about 415. 6 km of highways and comprises six highways, namely g2513 (zoe's section), s49 (sin seng), s96 (sinqing's branch), g1516 salt saloon high-speed flood, s65 xu ming's high-speed tsui region and s16 company high-speed boarding to the yang sector, dominated by liang bridge (sin, t beams, clustered boxes, transected trunks, silos). 2. Scope of procurement and related requirements 2. 1 scope of procurement: tracking quarterly milestones from the periodic inspection of bridges in 2025, removing ongoing enhancements in 2025, screening for those in need of repair in 2026, collection of information, site surveys, specialized inspections and necessary tests, site core detection, disease cause analysis, programme design, budget estimates, construction design and budgeting, construction volume inventory preparation, procurement coordination, expert evaluation and follow-up services, technical services, and follow-up services. Once the contract has been signed, the supplier may consult the procurement officer for relevant information. 2. 2 maximum response price: the maximum response price is 6 per cent (including taxes) and the response rate is rejected if the response price exceeds the maximum response price. 2. 3 the design plan cycle requires: (1) a written supplier to track quarterly milestones from the date of the contract for periodic inspection of bridges in 2025, as required by the purchaser, and to carry out the relevant design work in batches. (2) survey design cycle: completion of information gathering, exterior inspection and design options for all projects by 30 september 2025, completion of construction plans by 31 october 2025. The mapping exercise was completed by 30 november 2025. Programme design and construction design are reviewed by the procurement organization. (3) construction procurement cooperation and design follow-up services: construction procurement services should be provided in a timely manner, the written vendors should cooperate with technical services, the main designers should be present on the site on a weekly basis to resolve problems in the design of the site and attend the necessary site routine meetings. (4) the design information is not less than required by the terms of the contract. (5) sold suppliers prepare design progress plans based on the requirements of the purchaser and their own circumstances. Note: purchasers can adjust the design cycle to take into account the overall progress of project implementation. 2. 4 service location: highways under ninzhou's jurisdiction. 2. 5 quality requirements or service standards: qualified. 2. 6 segment division: this project is divided into one sector, namely nsx2025-fw-0030-01。




