Part iii: cost control priorities and content of the researchable phase
1. Concept of feasibility study
Ii. 21 key structures and content for researchable reports
3. Researchable focus: market surveys, product programmes, financial evaluation
Project cost-benefit projection table
Case sharing: operational guidance on content that can be developed for a large property
Part iv: cost control priorities, criteria for the design phase
1. Implementation of the design 6 standards
2. Introduction of standard design
3. Implementation of the five elements of the quota design
4. Control of contractual measures
5. Value engineering 5 applications
6. 8 economic evaluations of project design
Main limit indicator: design fee: 2 marketing fee limit: 3 steel bars, concrete limited design 4 external floor and window standard limit: 5 outer surface materials 6 landscape works limit: 7 public areas renovation standard limit 8 sales display renovation standard limit
Case sharing: 3 cost-control cases in the design phase
Part v: cost control priorities at the solicitation stage, case resolution
Cost control elements at the solicitation stage
2. Selection of solicitation modalities
3. Appropriate contract price
Factors affecting the choice of contract valuation
5 cost control focus at bottom
6. Cost control focus during bid evaluation

Case 1: legal disputes over deviations from actual prices
Case 2: underground leakage, resulting in malicious collusion of potential bidders
Part vi: cost control priorities, measures, cases at the contract performance stage
Cost control elements for the contract performance phase
2. Five major issues in contract formation
Cost control measures at the contract performance stage
Cost control focus at the contract performance stage
Case 1. Increased costs of embedding concrete
Case 2, foundation project, stake longer than design
Case 3, base pit protection, platinum extraction
Case 4, redecoration of the roof of the golf apartment building
Case 5. Second change of fire-proof curtain door in the garage of the golf apartment building
Part vii: triangular cost control focus
One, summary of the trilateral project two, five major problems with the trilateral project
3. Elements for control at different stages of the trilateral project1
2 tenders for construction projects and contract determination phase
Control of the cost of work during the construction phase of the construction project
Control of the cost of work during the completion phase
4, 6 priority areas and 10 methods of cost control for trilateral work
Case sharing: 4 priority case sharing for cost control of trilateral works
Part viii: change transaction cost control focus and case analysis
1 design change management: 1 for 3 design changes 2 for 2 reasons 3 for 7 aggregations
2. Design change control 6 priorities
3 - contact control 7 points
4. Contact control 4

Case sharing: prominent enterprises design change communication management systems
Ishigami wanda square exchange claim
Part ix: management control priorities, principles for construction claims
1. Construction claim management concepts and features
Three categories of construction claims:
3. Four causes of construction claims
Construction claim 2 process: 1 contractor's claim; 2 contractor's claim
The four principles governing construction claims
Review of evidence of claims
Case sharing: 12 construction claims management case sharing
Part x: cost dynamics control and case analysis
1. Two main tools for effective monitoring of dynamic costs
2. “triple control” for dynamic costs 1-code contract change 2-creation change 3-creation pending contract planning
3. Design quality control
4. Tender price
5. Visa changes
Case sharing: cost dynamics control case sharing for the dragon lake group
Part xi: cost control priorities and techniques during the completed accounts
1. Concept of completed accounts
2. 10 main issues in the completion of the settlement
3 completion of 14 critical elements of audit
4 engineering settlement 3 techniques
5 completion of four critical points
Summary of cases shared in completed accounts

Part xii: cost control focus at the sales stage
1. Composition of sales costs: a crown fee of 2 for planning services 3 for advertising 4 for marketing activities 6 for sales agents 7 for materials production 8 for marketing facilities 9 for public facilities 10 for operating facilities
2. Marketing costs 8 control requirements points
Case 1, marketing costs for five large group shows
Case 2, manko group regulation of marketing costs
Part xiii: head office, project company secondary management system
1. Cost components of real estate: a first-period cost of land, 3 engineering costs, 4 marketing costs 5 management costs 6 financial costs
Target cost management system - prior
Dynamic cost management systems - in the process
Post-cost assessment system - ex post facto
5 cost-of-responsibility system - responsibility and incentives
Case 1, cost management system case - haitian-chinese
Case 2, specific approaches and experiences in cost control for real estate project development
15-30 minutes of live communication. It is recommended that the real estate enterprise organize a team。
Curriculum
Course theme: field exercise on cost control and optimization of core elements for real estate projects
Date and place: 519-20 march 2022 (swissday)
Sponsor: winner training
Course counselling: 020-37128276, 13632218871