[pretty]6 check gear gears, connection keys to clean gears, and check teeth wear, mm, slots and keys, or fix or replace bonds. Check the brakes, check the bearings for 400 hours, remove the brakes, check the surface wear of the snails, mm, clean the rear embedding lubricants and replace the bearings as appropriate. 2. The fixed state of the bolts and the open gears must not be compromised, the fixed position of the gears must not be altered, the slots must not be loose and the rods should be well integrated. Inspection of the condition of the various components to regulate the screws, the wheel, the hood, etc., should be completed, otherwise the damaged parts should be repaired or replaced. Welders are checked for functioning without noise, otherwise the bolts of the institutions should be tightened. 3 check that the shield and shield are fully equipped and secure. Equipment user: on the date of the construction site mechanical maintenance log, the 15th floor of the third phase of the construction project at the grand market east city in the name of the construction site, using the equipment welder code number number 3 for the equipment of the first construction engineering company in tsai creek county, shall be maintained. 6 cleaning and organizing wires by blowing the dust off the wire, tightening the iron core with bolt bolts, and the wires and connectors should be organized in such a way as to tighten the inside of the line column. The first and second circuit poles and the insulation plate are checked and the surfaces of the insulation poles are not burned, and when attached to the head, the upper and lower copper cushions shall be attached and the screws shall be tightened, and the insulation plates shall not break and burn. The inspection of the ground-mounted iron shell switches and the location of the body shall be good (and connected) and the electrical resistance shall not exceed 10 om. Inspection of the condition of the various components to regulate the screws, the wheel, the hood, etc., should be completed, otherwise the damaged parts should be repaired or replaced. Welders are checked for functioning without noise, otherwise the bolts of the institutions should be tightened. 3 check that the shield and shield are fully equipped and secure. Note: equipment user: on the date of the construction site mechanical maintenance log, the 15th floor of the third phase of the construction project in the great east market, east city, using the equipment welder code number number of the equipment of the first construction engineering company in tsai creek county, is required to maintain the item. 5 check oil seals, triangulation belts for oil spills and re-enrichment seals, which are suitable for flint pressure of 1015 mm, and should be replaced if broken and faults occur. 3. The blockhead and the workspace blockboard should be intact, equipped and flexible in working space rotation. Equipment user: on the date of the construction site mechanical maintenance log, the 15th floor of the third phase of the construction project in the grand market east of the city, the name of the construction works, using the unit of the first construction engineering company, tsai creek, the name of the steel bender, and the serial number number of the equipment for the maintenance project, require that the order of number of the 1st type of equipment be provided in order to provide for the cleaning of the body of the mingwei person, to check for lubrication and remove the dust from the machine, and to add lubricants in accordance with the lubrication regulations. When inspecting the clamp, replace the bolt, and the internal nut wears more than 3