  • (ii) compilation of solutions to the problem of price management for construction works in nanjing i

       2026-04-30 NetworkingName1360
    1111111
    Key Point:Question one: how should chapter xx, scaffolding project, elevator well line set subheading be applied in jiangsu province construction and decoration project 2014Elevator well frames are scaffolds, regardless of the size of the well, which are to be removed when the structure of the well is constructed or installed. Where a project includes a combined scaffolding cost, no elevator pits will be charged。Question two: construction works are

    Question one: how should chapter xx, scaffolding project, elevator well line set subheading be applied in jiangsu province construction and decoration project 2014

    Elevator well frames are scaffolds, regardless of the size of the well, which are to be removed when the structure of the well is constructed or installed. Where a project includes a combined scaffolding cost, no elevator pits will be charged。

    Question two: construction works are carried out by a lump sum unit, in which the amount of earth-drilling or filling in the unit works is more than 5000 m3, which is calculated on the basis of large-scale gravel works, in accordance with the provisions of the 2014 version of the standardized costs for construction in jiangsu province. Ask whether the flat site project for the unit works should also be included in the large-scale geotechnical project

    The flat site should be included in the large-scale geotechnical project。

    Distinction between the unit price of manual wages in jiangsu budget and the price of manual guidance

    Question three: the price terms of a construction contract for a building work contract provide that manual wages may be adjusted in accordance with policy documents. The winning unit will bid the price by multiplying the number of personnel by 1. 3 by the fixed labour content. Asking about policy adjustments to labour costs, how should they be quantified

    Response: the above-mentioned quotations, which have exceeded the assigned amount for manual consumption, are considered to be equal to the bidder's unit price multiplied by a factor of 1. 3, which shall be offset by the excess amount. Conversely, the difference between consumption below the flat level should not be increased and could be considered a preference for bidders. (based on three considerations: first, that the current status of the autonomous offer by the bidders is not changed; second, that the adjustment of the policy manual unit price is usually based on a flat consumption and market price; and third, that the unbalanced offer is avoided or balanced as far as possible. I'm not sure

    Question four: for a municipal drainage project, the main pipe of rainwater and sewage pipes is 600 mm in diameter, and when applying the 2014 " quota for construction costs in jiangsu province " , the type of work is in category ii or iii

    In the “strategic classification of municipal works”, rainwater and sewage pipes for drainage projects are classified as work in two units, so there are three types of rainwater works and sewage projects。

    Distinction between the unit price of manual wages in jiangsu budget and the price of manual guidance

    Question five: is it necessary for the construction unit to tender for a decorative project in accordance with the limit of the price of the manual pay guide for construction works in jiangsu province, issued by the provincial building office

    Response: at the time of the tender, the price of manual salary may be quoted by the tendering unit, and the price of manual salary for construction works in jiangsu province shall be applied primarily to the basis for the bid control price preparation and for the settlement of the contract. Since the manual wage guide price for decoration works is an inter-district price, the manual wage adjustment is generally based on average differences。

    Question vi, 2014: what is the height of the operation in the ultra-high increase in the cost of installation works in jiangsu province (vol. X for drainage, heating, gas)

    An increase in the volume of works above the limit of 3. 6 m, when above 3. 6 m, and no increase in the amount of work within 3. 6 m, is applied to the distance from the operating location (or design plus minus 0) to the operating substance without floors。

    Distinction between the unit price of manual wages in jiangsu budget and the price of manual guidance

    What should be done about the implementation of the 2014 " installations in jiangsu province " (release 10 for drainage, heating, gas) project, where scaffolding costs, at the rate of the flat rate, cannot be used during the installation of special devices

    The scaffolding fee is calculated at 5 per cent of the labour cost, of which the manual wage is 25 per cent. Fees for scaffolding are considered as a combined rate and should be taken into account in the construction, regardless of whether scaffolding is installed or not. As most of the scaffolding in the installation works is considered on a scaffolding basis, the scaffolding costs are considered separately in accordance with the construction organization design, where special requirements exist。

    Question 8: what is the difference between sub-items 3-133 to 3-136 and sub-items 3-167 to 3-173 in volume 3 of the 2007 jiangsu province model construction and park engineering price table

    Response: the focus of the two sites is different, ranging from 3-133 to 3-136, which are divided by the diameter and density of the earthballs planted in the shrub and are used for monoculture. The 3-167 to 3-173 items, which are divided by the height and density of the green fence, are used at a certain level to plant green fences, shrubs and floors (including dwarf bushes: chastity of gold leaves, red flowers, eight-point gold plate, peach corals, paching, short bamboo, small vegetable plants, etc.). The two items are determined on the basis of the number of plants planted within the area, so that the combined unit price is the same in the case of the two sites. In the case of isolated shrub cultivation, 3-137, 3-138 items should be used。

     