Why don't you just sell it
I'd like to use the air conditioner at home for five or six years to make a move, and then the workers will read it to me. It's a shame i didn't listen to you. I thought the new air conditioner would be at least 1,000
But by the time i paid, i regretted it: i had $520 on the move, and if i saved it, plus $300 for the air conditioner, i would have bought a new air conditioner。

520! What a wonderful number, but now i only feel blood in my heart. At the same time, it was outraged that the price of $260 was doubled when it was offered. Instead, the workers told me that 260 dollars was just the cost of dismantling and loading, in addition to which there were six additional charges, and that almost no one could avoid them all。
#01. Plus charges
And it's not the first time that i've moved, and i've found a metal pipe that connects the inside and the outside, and it just breaks. This time, the worker explained to me that there were fewer circuits on the hanger, and if they were of good quality, they would continue to be used, and that the cabinets would almost always be replaced。

I know there's moisture, but i can't refute it. After all the workers showed you, the air conditioner just broke. But it will not be known whether it is a split caused by the flight, or whether it was broken by him。
An air conditioner tube costs about $100 per metre and a copper pipe costs about $50 per metre. An air conditioner requires at least 2 to 3 metres of pipe, and it costs $2,300。
Transport costs
It was my mistake: i forgot that the air conditioners were only air conditioners, not roads. Previously, the transfer was closer, and the workers threw the old machine directly into their van and took it to the new room。

We need to protect the air conditioners before they move
This is a long trip. The workers asked me for $50. Or there's another option: i'll pull through with my own car. It wasn't too expensive, so i agreed。
Workers said that additional removal costs would be required in case of a need to climb a building. He didn't say the exact price, but i think it's worth at least a few dozen dollars。
#03. High altitude operating expenses
There is a great deal of domestic electricity that requires high-altitude work, such as new wind systems, wall-mounted solar water heaters, etc. However, only the air conditioning industry is required to charge additional high-altitude operating fees。

High-altitude operating fees are charged on the floor, at a rate of $100 on the 2nd ~ 10th floor, $150 on the 10th ~ 20th floor and $200 on the 20th floor and above. An air conditioner movers, dismantling and fitting all need to be considered for floors and charged once at the highest standard。
This time, for example, my machine is on the 13th floor at a rate of $150, and on the 24th floor at a rate of $200. I was finally charged $200 -- one job at a high altitude, not one job at a time。
#04. Fluorinated charges
I'm really bored. Why is the air conditioner working so well, it's not fluorine when it moves? I've moved many times. I've never seen a fluorine-free machine。

Of course, i don't know if it's true or not. The pressure sheet was attached to the air conditioner, however, and showed insufficient pressure. I've mentioned that, too. A lot of netizens say the pressure table is bad。
It depends on actual demand (the worker's mood). The transfer was the lowest fee for fluorine. I received $30。

Fluorinated
#05. Web dismantling fees
The worker said, "you'll get free of the network demolition." it was also today that i knew that the installation of air conditioners and the “web-dismantling fee” said that the installation workers did not mention the cost when the air conditioners were installed。
The air conditioners now have a special outdoor space and some of them have a decorative network outside. The installation of air conditioners will certainly remove the decorative network and will need to be restored. Dismantling and decorating networks sometimes require a fee of $50 per unit。

There's a decorative net on the outside
But it's just “sometimes” (after all), so ask before looking for a worker. If you charge a fee for dismantling the net, i think the worker is in the money。
#06. Pocket charge
If there are no air-conditioning piping holes, or if the holes are not suitable, re-pores are required. What do you mean, it's inappropriate? I've seen it once: when i rented a room, the air-conditioning hole was too high and there was a plaster line in the room

I took the plaster line down because it's not my house. I don't want to pay for a hole. But if it's your own house, the best solution is definitely to re-hole. The cost of perforation varies from $50 to $100, the light wall is cheap and the wall is expensive。
Another special case is that some new air conditioners require larger air conditioners (60 mm normal and 80 mm new air conditioners). This is a time when an amplification is required, which, regardless of the wall, is about $50。
Obuchi
Self-censorship + network (absorption)
# autumn life creative #




