[pretty]. (2), surfaces shall be flat, clean, colour-consistent and shall not be warp, damage, colour change, alkaline, stains, slurry flow marks, light colour loss. Bricks must paste quality indicators and the means of testing (1), the types, specifications, colours and patterns of coating bricks must meet design requirements. The materials used to find layers, binds, glues and stitches and embedding should be tested prior to the construction of the facade paste. Surface sizes, water intake and anti-frozenness must meet regulatory requirements. The field sample was tested and used. In general, the seven-day strength will be sufficient. Cement: this project uses regular 325 silicate cement, which must have a certificate of accreditation and stability to meet the requirements. The products that were not qualified for the second test were strongly withdrawn. Material control 1. Material control: entry of materials, semi-finished products and finished products is subject to rigorous testing in accordance with the specifications, drawings and construction requirements and is ineligible for immediate exit. (13) sutures: when the symptoms of self-censorship and imperviousness are covered, they are sewn with a special suture. The tiles leave a gap as required by the design (generally 38 mm). (11) placing bricks: once the floor of a brick is mixed with 107 cedar cement coatings, it is attached directly to the bottom ash. (10) base ruler: the standard for the lower exit of the first brick is set on the basis of the height of the lower bounds of the calculated bottom brick. No, no, no. The location of the door and window openings is consistent with the design layout requirements. It is not less than 10 millimeters deep, coherent and must be a brick. At the bottom of each layer, the grey cake is used as a reference point, so that the bottom ash is flat and square. From the top floor, it can begin to be hung vertically by a specially designed large line of barbed wire, followed by the setting of points and the making of grey cakes according to the specifications and sizes of ceramic bricks. (6) bricks, bullet lines: bricks can be discharged as required by drawings when 6 to 70% of grass-roots ash is dry. For the second time, the slurry of the same match was used to level the band, with a short bar, with a low cavity pre-filled, and finally with a plaster. Reduced dust-covering empty drums. (4) brush interface: after cleaning the dust from the wall, full of the interface. The width of the wire is 300 mm wide per side. (2) grizzly cakes: depending on the situation on the ground, hanging vertically, looking for rules and pastings. (1) cleaning of the outer wall: check the cavity of the wall and flatten the brick or concrete that emerges from it. Each layer is separated at the branch, and the length is adjusted between 56 mm. Once the template has been completed, it must be certified by the quality review department before the team can be organized to work according to the template. (4) selection of bricks by the size and colour of the bricks and their sorting for storage. (2) the opening of holes and drainage pipes should be completed, the doors and windows should be secured and placed in a cement slurry of 1:3