    Key Point:Description: glass steel cooling tower maintenance, when restarting after long periods of shutdown, should be careful to leave empty for a certain period of time before entering normal operation, should the power supply be cut off immediately in case of failure to process the power out, should the cooling tower clean-up be performed in a manner that results in the creation of a dedicated pharmaceutical agent, and should be non-phosphate-free, pri

    Description: glass steel cooling tower maintenance, when restarting after long periods of shutdown, should be careful to leave empty for a certain period of time before entering normal operation, should the power supply be cut off immediately in case of failure to process the power out, should the cooling tower clean-up be performed in a manner that results in the creation of a dedicated pharmaceutical agent, and should be non-phosphate-free, primarily to avoid secondary contamination of the water quality of the cooling tower by the agent。

    Maintenance and maintenance process for glass and steel cooling towers

    1. Before the glass steel cooling towers operate, check whether all pipes and valves are open。

    2. The cooling tower must be carried once before it is activated in order to be fully operational

    3. A daily tour of pumps, wind machines and plumbing is conducted and recorded。

    4. The fillings should be replaced in a timely manner when wear and tear resulting from ageing is found。

    5 when the water temperature is the same as the rated current of the electric power, the motor is overloaded, and the electrical input voltage should be reduced to maintain normal operation

    6. Water stored in the pipeline of the circulatory water system shall be washed when it is discontinued in the winter;

    7. Regularly ventilated and ventilated

    8. Full cleaning of fillings should take place every three months

    9. Weekly inspections of miscellaneous items on water pipes

    10. A routine check should be carried out annually on surface preservatives such as resin, paint, etc

    11. When restarting after a long period of decommissioning, be careful not to be able to go into normal operation for some time

    12 if circumstances such as power outages cannot be addressed in a timely manner, the power should be cut off immediately

    13 if the glass cooling towers are damaged during transport or loading, deformation is normal。

    1. An inspection and maintenance shall be conducted annually;

    Electrical maintenance is carried out according to the normal electrical pattern. The gear case shall be filled with lubricants on a regular basis and shall not be below standard lines;

    3. Fills, casings, if any, must be removed in a timely manner to prevent congestion, fillings should be cleaned for a period of not more than one year, usually every time they are used;

    4. Pyramids are coated with corrosive paints depending on the degree of corrosion and not required for stainless steel materials;

    5. Long-term non-use or winter non-use of towers, clean water in the corridors and covered with tarpaulins in order to prevent the entry of stolen goods and the sun and rain。

    The cooling towers are cleaned and maintained in such a way as to create a dedicated pharmaceutical agent, which is used to opt for phosphorus-free, primarily to avoid secondary contamination of the water quality of the cooling towers. The agents can kill microorganisms, fungi and various powerful oxidizing viruses. At the same time, clean up the dirt in the cooling towers and ensure that the cooling towers are able to disperse the heat at work.

     