N haidu, wong xiao yong, correspondent, zhang li-yu
Attention
13 october 2021-13 january 2022
Construction of the old bridge in quanzhou
Implementation of semi-closed traffic control
All motor vehicles out of the city are banned
Journalists were informed by the traffic police detachment of the city public security bureau and by the direct sub-centre of the municipal roads development centre that, since 9 a. M. On 13 january this month, semi-enclosed traffic controls had been imposed during the construction of the old bridge in spring county, prohibiting all motor vehicle movements from the city's direction (walkers, non-motor vehicles are still able to move in both directions), and that the motorway into the city's direction remained in place, but a bypass was recommended。
The construction of the bridge and the extension of the bridge along the 324-line state road is proceeding in an orderly fashion, as a major traffic route, and the project has been accompanied by the maintenance of traffic on the side of the construction, and the subsequent repair and repair of the bridge (known as the old bridge) will have an impact on existing traffic operations. In order to ensure the smooth running of the works and the safety of traffic during the construction, the bridge construction section in spring county will implement two phases of traffic control, which will affect motor vehicle travel to a certain extent, as follows:
Control time and measures
(i) construction and strengthening of the old bridge in quanzhou
Control period: 13 october 2021 to 13 january 2022。
Semi-confined traffic controls are in place during the reinforced construction of the old bridge in quanzhou, prohibiting all motor vehicle traffic in the direction of the city (walkers, non-motor vehicles are still able to travel in both directions), and motor lanes in the direction of the city remain in place, but a bypass is recommended。
(ii) widening of bridges and wires in spring county
Control period: 15 february 2022 to 30 november 2022。
Control measures: during the construction of the quan state bridge and the extension of the line, the north section of the riverside section of the bridge was subject to ultra-high vehicle traffic controls, and vehicles of super-high (3. 5 metres and above) were prohibited from travelling on the north road of the river (the shinji bridge to the tana an bridge)。
Diversion measures
(i) diversion routes for external transit traffic
1. A bypass and diversion route to and from quanzhou: it's through the state road g324-fon ji road-poncho bridge-poncho road; or through the state road g324-poncho road-airport rapid road-ton an-ton bridge-ton。

(road map of vehicles in the direction of the gate to the city)
South ann to and from downtown quan state bypass and diversion route: travel in non-old city areas, suggested to be taken from south rim road - front avenue - hwang long bridge — north-south avenue in front of the station — west and west avenue in front of the stop — maroon road — lo river (fuzhou); or through the south rim road — north spring road — feng ji road — coron bridge. The ancient city area is to be visited by south rim road. Wong long bridge - north qingdong road - north river road or south rim road - sing jiang road - sing river bridge - new gate street。

(road map of vehicle bypasses in the south of the country)
The route of bypass and diversion between jinjiang and the city of quan state: it is proposed to pass through the airport's fast-track road, the tanian bridge, the tanan bridge, or through the pan am north road, the feng ji road, the giang bridge, to avoid entering the perimeter of the construction area。

(road map of the road towards jinjiang)
(ii) traffic diversion routes around the construction area
1. Vehicle bypass route from the city direction:
(i) passed by wen mau road - spring su street - annan road - tanan bridge
(ii) by the shinji bridge, the all-china road
(3) passed by wendling road — bochu street — tanan road — tanan bridge。

(vehicle bypass road map out of town)
2. Emergency route out of the city when pochu street-win mahal nodes are blocked:
Following live traffic, the city exits from the wen mau road, the lantern road, the tenan road, the tanan bridge。

♪ a road map out of town ♪
3. It is recommended that vehicles in the direction of the city be bypassed:
(i) south boulevard (south ribbon road)—hingxia road—looking at the river road—south riverside road—tai an bridge
(ii) through the shinji bridge, south boulevard (south rim road)
(3) by shinbei-hingxia road-seen river road-south river road-tai an bridge

(vehicle bypass road map into town)
(iii) the vehicle bypass path at high height (over 3. 5 metres) on the northern road of jiangbin:
(a) a vehicle that is ultra-high in the direction of the gate: by the north road of the riverside, the riverside bridge, or by the south road of the riverside, the north road of the riverside, the main bridge of the field, or the south road of the river。
High-altitude vehicles in the direction of fonghai road at the gate: by way of the riverside north road - the shinji bridge - the riverside south road。
3. The shunji shin bridge, which enters the city at extremely high heights, is prohibited from making a right turn on the north road of the river. It is necessary to make a left turn through the dry gate at the end of the land in the direction of the entrance to the port。

(superhigh vehicle road map)
At that time, traffic signs, line signs and instructions are brought to the attention of the driver of the vehicle and are subject to the command of the civilian police and management on-site。
♪ the bus's changing
Journalists were also informed that, as a result of the extension of the bridge in spring county, a one-way closure of the bridge in spring county (to the south of the bridge in the central city) had been implemented since 13 october 2021. As a result, 18 bus routes through the spring state bridge were diverted. Of these, nine routes, 23, 35, k207, k301, k306, k508, k603, k701, k902, etc., have been diverted one way to the tan bridge; seven lines, k201, k202, k203, k308, k602, k604, k612, have been diverted one way, and two routes, 20 and k7, have been converted to the shinji bridge。




