
26 a. M
The first ship in the province was built by the boat crew
2,800 cruisers are out of the dock
It's expected to be delivered to the finnish viking shipping company by the end of this year
This represents the capacity of our city to build and maintain this type of ship and will provide complementary guarantees to facilitate the construction of an international shipping centre at the gate。
It's 13 floors and 218 meters long
I understand
This is a 2,800 cruise ship
About 218 meters
35 meters wide, speed 22. 1 knots
There are 13 decks
Configure all types of leisure and recreation facilities
2,800 passengers and 200 crew members
There are a total of 1124 residential rooms
The ship is equipped with a variety of european hospitality restaurants, tax-free shops, art halls, multi-purpose conference centres, children's parks, large-scale cruise decks, spas and swimming pools。
It's worth mentioning
This ship has 1,500 meters of driveway
For sedan transport
Heavy vehicles and container trailers, etc
Deputy chief engineer and project manager of shipwreck: using lng gas, 90% of particulate emissions can be reduced. It can also reduce co2 emissions by 20-30 per cent. The successful construction of this type of ship has been a major boost to the cruise industry and a complement to the cruise industry。
The 2,800 cruisers made it out of the dock
At 9 a. M., following an order from the head of the station, the crew of the boat heavy crews were travelling in orange red life jackets, some holding cable lines, some directing tugboats, while the winch on both sides of the dock was slowly moving and moving slowly outside the dock through a tight cable towed 2,800 mail boat。
Finally, under two tugboats
This ship will be docked to the pier
Final construction and interior fit-out completed
Deputy chief engineer and project manager of the shipwreck. Work is organized as soon as possible on board the ship, mainly around two lines, one of which is the commissioning of the terminal of the equipment system and the interior work of the public and residential areas, which is expected to be ready for use before the end of the year。
♪ on the sun, towards the sea ♪
Congratulations to the ship heavyweight
We're on our way
Source: xinmen radio
The shipwrecking crew, with its initial capacity of 2,800 cruisers, was able to get out of the dock. (this chart/communicator highlight)
Overlooking 2,800 cruise ships。
On the morning of january 26th, this newspaper (journalist chen zhuang correspondent mei zheng) was successfully discharged from the docks of a 2,800 passenger cruise ship, which was built for the finnish viking shipping company by xiamen heavy worker co. Ltd. (hereinafter referred to as “the ship heavy worker”). The ship's technology world is leading, with a new generation of cruise ships with a combination of transport, tourism, leisure, shopping, etc., a beautiful boat, a luxury renovation and energy conservation。
The reporter was informed that the ship had a total of about 218 metres in length and 35 metres in width, with a speed of 22. 1 knots and a total of 13 decks, with a capacity of 2,800 passengers and 200 crew members, and a total of 1124 living rooms and about 1,500 metres of driveways. The ship is equipped with a variety of european hospitality restaurants, tax-free shops, art halls, multi-purpose conference centres, children's parks, large-scale cruise decks, spas and swimming pools。
With regard to the automation of ships, the ship has a globally advanced central control and alarm surveillance system, which fully applies the globally advanced optical transfer technology, bus communications technology, fully integrates the control and data information of the ship automation system and is then processed through the advanced computer software technology platform, making the operational use of the subsystems easier and more intelligent. The ship has access to all automated equipment throughout the ship and to alerts and alerts at any station and extended alarm boards. Some of the workstations also have special controls in accordance with operational requirements, allowing for intelligent management of the entire ship's electricity supply, cargo compartment ventilation, ballast state, residential air conditioning, etc., which fully reflects the overall upgrading of ship automation。
The construction of 2,800 cruise ships marked an entirely new phase in the development, design and construction of cruise ship heavy workers, which facilitated the process of autonomous design of high-end domestic cruise ships and laid the foundation for the construction of luxury cruises by our provincial industry。




