    Key Point:Boiler room management system and operating protocolsBoiler room management system and operating protocolsThe boiler room management system1. Operators of boiler systems must be on duty with valid corresponding documents。2. While on duty, boiler duty operators are required to perform their duties in a serious manner and to comply strictly with the system of mobile inspection, water quality management, equipment maintenance, safety testing,

    Boiler room management system and operating protocols

    Boiler room management system and operating protocols

    Maintenance system for boiler equipment

    The boiler room management system

    1. Operators of boiler systems must be on duty with valid corresponding documents。

    2. While on duty, boiler duty operators are required to perform their duties in a serious manner and to comply strictly with the system of mobile inspection, water quality management, equipment maintenance, safety testing, cleaning and hygiene, hand-over, etc. To ensure the technical safety and functioning of the heating system。

    3. Periodically verify, overhaul or replace safety valves, pressure sheets, safety attachments and pressured components to ensure that they perform normal technical functions in accordance with the relevant provisions。

    4. A wash of the water table on each shift, a manual opening of the safety valve every week, a self-jet test of the safety valve once a month and a detailed technical status record and ready for inspection。

    Water, electricity and pipe lines are regularly inspected, and “run-and-drop”, “white-water table” and “filled water” phenomena are firmly eliminated。

    6. Maintain a daily system of water quality tests and regular discharges to ensure the quality of water and stoves. Adequate soft water reserves are regularly maintained。

    7. In case of electrical and welding maintenance, the boiler room must be submitted to management for approval, and the gas source must be severed, the inflammable gas identified and protective measures taken. Firework is strictly prohibited in the boiler room。

    Target site management system

    1. Non-duty personnel shall not be permitted to enter at will。

    2. When non-duty personnel enter a critical site, they must first register and be informed by the duty officer of security matters to which they are entitled。

    3. The placement of flammable and explosive materials in and around the boiler room is strictly prohibited and the washing of laundry materials in the boiler room is not permitted。

    4. Inspections by superiors must be accompanied by company managers。

    V. Visits by outsiders are subject to prior contact with business authorities and to company management leading access。

    When non-duty personnel enter a critical site, they are placed under safe custody。

    The boiler shift system

    First, the replacements are prepared for the boiler in advance of the scheduled shift and at the required time, with detailed information on the operation of the boiler. The replacement must arrive 15 minutes in advance。

    2. When a boiler driver turns over, the system of face-to-face shifts must be strictly enforced, and if the replacement does not arrive on time, the shift must not leave the job。

    3. Prior to the transfer, the equipment and operating sites must be cleaned up and the environment cleaned up。

    4. Prior to a shift, the shift personnel shall inform the successor of the operation of the equipment on the shift, and the problems arising on duty shall, as far as possible, be resolved on duty in a timely manner and, if this is not possible, in a timely manner, assist the replacement or maintenance staff and report back to the duty manager。

    V. Prior to the shift, the shift is to keep a record of the operation of the on-duty equipment, prepare in advance, carry out thorough and thorough inspections and adjust to keep the boiler operational。

    6. Before taking over, the successor is required to conduct a thorough examination of the content of the succession, which, when no problems are identified, sign the “shift” book before the person leaves the workplace。

    Tour inspection system

    First, duty personnel are required to carry out careful and timely inspections and to report promptly when problems are identified。

    The route of the tour is usually from the front to the back of the oven, from the bottom to the stove, from the instrument, from the attachment to the pipe, and during the course of the tour, careful inspections are made of the pilot, the drum and the stove。

    Iii. The main elements of the inspection are: presence of drum packs, deformation, leakage in the visible parts of the boiler; presence of abnormal sound in the combustion chamber; soundness of the wind-drilling machine; reliability of safety attachments, protective devices and instruments; tight plumbing, valves; flexibility of valve switches; normal operation of the pumps; wear and tear of the devarnisher, etc。

    The inspectors are required to fill out the records of the tour。

    Equipment maintenance system

    First, the maintenance of boiler equipment is carried out on a regular basis in the condition of unstoppable stoves。

    Ii. Maintaining the stove as it can be maintained in conjunction with the problems identified by the mobile inspection。

    Key elements of maintenance:

     