    Key Point:Hangzhou's 40-metre brick chimney maintenance companyJiangsu highland engineering ltd. Works on a variety of cement chimney removal, hand-made stowage of boiler chimneys, stowage of kiln chimneys, overall collapse of chimneys, demolition of brick chimneys, demolition of television towers, removal of water towers, installation of mine-shield needles, chimney-painting colour rings, chimney-painting paints, chimney writing, steel structure preservat

    Hangzhou's 40-metre brick chimney maintenance company

    Jiangsu highland engineering ltd. Works on a variety of cement chimney removal, hand-made stowage of boiler chimneys, stowage of kiln chimneys, overall collapse of chimneys, demolition of brick chimneys, demolition of television towers, removal of water towers, installation of mine-shield needles, chimney-painting colour rings, chimney-painting paints, chimney writing, steel structure preservation, wind-gener tower protection, chimney retrofitting, ash-cleaning of chimneys, and chimney screening. ♪ to please the sky ♪

    Special operations, domestic, high altitude, no area, construction

    Hangzhou's 40-metre chimney maintenance company is pleased with the high-altitude chimney removal to determine how the chimney was removed, to see the scene around the chimney and to determine whether it was “manual” or “directed”. Dismantling of chimneys is a high-risk project, and there is a high risk of accidents in the chimney demolition work if there are not enough crews to do so. My company has accumulated a wealth of work during years of chimney demolition work, and each of the chimney demolition teams has experienced hundreds of chimney demolition works and has been extremely rich in requirements to ensure that the chimney removal works are completed. ♪ to please the sky ♪

    The company provides you with the following technologies: "scaffoldless, unstoppable construction, high-altitude suspension work":

    (i) high-altitude construction: construction of new brick chimneys (up to 65 m), chimney slides (up to 240m), chimney drawing design, basic irrigation, services such as packaging, wheel kilns, tunnel kilns and water towers, grain silos, cement storage tanks, high-level work on chimneys。

    (ii) high-altitude demolition works: a variety of chimneys, water tower demolition (manual demolition, directed demolition), iron tower demolition, urea particle removal, television tower demolition, iron interdiction, high-altitude frame demolition, and other difficult high-altitude demolition works。

    (iii) high-altitude maintenance works: chimney retrofitting, chimney ashing, chimney inspection, chimney injury, crack repair, chimney reinforcement, chimney removal, chimney correction, chimney replacement, chimney top repair, overhaul or replacement of mine shelter facilities, chimney painting, wheel kiln maintenance, tunnel kiln maintenance, chimney smoking, etc。

    (iv) high-altitude installation works: installation of detonators, beacons, beacons, steel chimneys, ladders for chimneys, safety platforms, safety nets, escalators and various iron towers, plant buildings, workshop glass, etc。

    (v) frozen-gas desulphurization works: series of projects such as stacks, flue lanes, foam bricks on the inner walls of the desulphur towers, ad hoc acid-resistant sludge coatings with ls300, om, urination, construction of flail desulphur-resistant coats such as pv, etc。

    Steel structure reinforced chimney inspection maintenance unit

    (vi) high-altitude corrosive works: chimney brushing rims, chimney brushing paints, chimney painting, chimney writing, cooling tower preservation, sewage tank preservation, acid pool preservation, steel structure preservation, furnace protection, pipe preservation temperature, wind generator tower protection (cleaning, spraying, maintenance), iron tower protection, chimney protection (platform, climbing, nettage), oil storage tanks protection, dragon door hanging, hotel, building exterior wall painting, crane protection, etc。

    Special operations, domestic, jiangsu high, oriented, area-neutral, construction!

    Safety responsibilities: if the work is contracted for, the construction security measures shall be prepared and carried out by us, and all security problems and responsibilities in the course of the work shall be borne by us and shall not be related to party a。

    Company: any unit that has been constructed by my company regularly visits or liaises during the warranty period to enquire about the quality of the works; if there is a quality problem during the warranty period, my company inspects the maintenance for free

    Purpose of service: “quality, credibility, security, respect for contracts, regular return visits”

    Construction characteristics: “no scaffolding, no cut-off, high-suspension, technical, honest”

    A chimney-directed dismantling: measure the centre of the chimney at the bottom, then calculate the width of the hole, then open holes along a line that has been drawn, with a thick plank or a wooden stick to open a hole to prevent the chimney from falling at any time, and set fire to the plank when it is in sufficient position, so that when the plank reaches a certain level, the chimney will automatically be dumped in the right direction。

    Two chimneys are being removed manually: a high-altitude climbing operation to the top of the chimney, the removal of the bricks with the tools of demolition, with hammers and jacks, to the inside (or outside) of the chimney, and, at the time of removal, to the bottom of the chimney, to protect against the fall of the remaining bricks or high-altitudes, and to build a platform on the chimney, which will allow the accidental fall of the remaining bricks or fall on the platform to achieve the objective of the demolition. Meanwhile, the demolition of the building crew will need to be accompanied by a reliable location for the removal of the chimney, as well as the preservation of its own construction tools, with no real loss

    Three chimney demolition programmes: demolition works, which should have an on-site command and organizational command, which should be adapted to the scale, complexity of the conditions and blast operation procedures required for the demolition of the building, and which should be carried out strictly in accordance with the design and construction organization plan to ensure that the work is carried out。

    Stack removal construction measures:

    Steel structure reinforced chimney inspection maintenance unit

    1. To remove the line around the chimney, the size of the area is determined by the circumstances of the project, but to extend the 50-metre radius from the chimney to the centre, while our company will send in and out of the dedicated area on a day-to-day basis during the construction。

    2. Pre-construction cleaning of the perimeter of the chimney removal works and the work required to remove the chimneys, such as the ash wall。

    3. The main tools of the chimney demolition work are excavators, hydraulic crushers, jacks, hammers, etc。

    The main engineering staff: one on-site project manager, three on-site construction personnel, one to two operators of each equipment, and one to two on-site personnel, which are in fact based on the different current business chimney demolition sites。

    During the course of the construction, there were cases in which the chimney removal work should be suspended。

    6. On the same day, the chimney demolition project was immediately halted following a windstorm above level 4。

    In the course of the work on the chimneys, equipment anomalies arose and the work on the chimneys was immediately suspended。

    8. In the event that the course of work on the chimney is not carried out in accordance with the scheduled programme, the work on the chimney is suspended and a reasonable programme for its removal is found after further study of the current situation。

    Safety responsibilities: in the event that this project is contracted for our services, the construction measures shall be carried out by us, and all problems and responsibilities in connection with the construction work shall be borne by us and shall not concern party a。

    The company has: wages, secondary protection, second-level construction, and construction staff with a “technical operating certificate for special industries” issued by the ministry of labour, and is fully involved in the life of the company, with no concern for the construction unit。

    Hangzhou's 40-metre brick chimney maintenance company

    Steel structure reinforced chimney inspection maintenance unit

    In recent days, environmental protection has been conducting thematic scheduling meetings on atmospheric pollution and chimney removal to study the deployment of atmospheric pollution. It is understood that on 28 june 2015, 10 actions were planned, all of which have a clear “road map” and a “schedule”. It was reported that in 2013, four model areas were targeted for integrated management of atmospheric pollution as part of the atmospheric governance effort. In 2014, our city will implement measures such as coal cutting, steel pressure, emission reduction, vehicle control and dust reduction to ensure the completion of the provincial emission reduction tasks, in line with the requirements of a three-in-one approach to the resolution of energy production, energy efficiency reduction and atmospheric governance. Ten actions have been planned around this goal, taking into account practical aspects。

    First, the “five industries” governance campaign, which involved the removal of chimneys in five sectors: steel, focal, cement, electricity and glass。

    Secondly, it was the “hundred-day attack” that resulted in the removal of 1052 chimneys throughout the year, accounting for more than one third of the total number of chimneys in the city。

    Thirdly, it is the main urban area that has organized city-wide and enterprise-level staff, organizing a weekly centralized city-cleaning operation to clear the city's roads, walls and walls。

    Iv. To implement the clean coal distribution initiative, at least one clean coal distribution centre has been built in each county (city, district), the distribution network has been gradually improved and the use of clean coal has been promoted throughout the city。

    V. Oil and gas governance operations, with 574 gas stations, 452 refuelling sites, 135 tankers and 7 storage tanks all completed in the city。

    Vi. It is a road-lifting and dusting operation, with clear sections, starting with vehicles, roads and greens, which seriously search for bulk transport vehicles that are carried and not covered, enhance the surface and greenen the cover。

    Vii. The yellow-marked vehicle phase-out was carried out through a city-wide special traffic rehabilitation programme, with 31,000 yellow-marked vehicles phased out during the year。

    It is a “sword-to-sword” operation, which is “zero tolerance” for behaviour and which insists that cases must be investigated, dealt with and strictly enforced。

    It's a corporate “back-to-back” exercise to look back at the problems that have been found in environmental protection since last year and ensure that they are put in place!

     