Today, the safe production library has brought to you a very practical and standardized training course on building safety standards。
I. Overview of the training presentations
(i) the scope-of-application course is applicable to the security management of all new, expanded, and modified tower cranes of the star river group。
(ii) preparation is based on the specialized norms in force in the country, such as safety of construction work, safety of towers, assessment of lifting machinery, temporary use of electricity, installation and dismantling, in conjunction with the group internal system。
(iii) the applicable population and industry are oriented towards the construction industry and are suitable for use by project managers, security guards, tower drivers, commanders, debunkers and supervisors。
Ii. Specific content of the training course
(i) basic security requirements
Heightened rectifiers, process limits, range limits, super-high limits, etc. Must be equipped and be effective。
The hooks and rollers shall be equipped with a de-insurance device and a guard shall be required to climb more than five metres above the ladder。
Walled devices must be installed at altitudes above freedom, and multi-turret operations must develop collision-proof measures。
(ii) installation, addition and dismantling
The base of the tower requires a design calculator of 80 per cent strength for installation and acceptance for operation。
Special programmes and contingency plans must be prepared for operations, with certified personnel on board and dedicated command。
There is strict compliance with safety of use of electricity and safety of distance from external power, protection from ground-to-ground zero, and wind-to-wind level 4 is prohibited。
(iii) installation of acceptance and inspection requirements
Self-inspection is followed by a tripartite inspection and clearance is obtained through special equipment tests。
The vertical deviation of the whole machine is 4/1000, and the receipt card hangs at the visible position of the fuselage。
(iv) operational and maintenance requirements
Heavy winds, thunderstorms and fog weather above class vi are prohibited。
Operators are certified to be on duty, regularly protected, and the aircraft is stopped exceptionally immediately。
(v) receiving and inspection information and common hazards
Identify the complete list of receipt and inspection information required for construction and supervision。
Common security issues such as diversion, failure of components, lack of protection, and violation of regulations。
Expected learning results
(i) to regulate the security standards for the complete mastery of the installation, use and dismantling of towers, in accordance with national norms and group requirements。
(ii) risk-proofing allows for the identification of hazards to the safety of towers and provides effective protection against accidents such as collisions, overturns, electrocutions, etc。
(iii) compliance management is skilled in completing receipt and inspection information.** preparation and filing for security compliance management of towers。










