Statutory representative: statutory representative: delegated agent: delegated agent:
Model contract for the repair and maintenance of construction firefighting facilities
A:b:
Article ii: subjects of contract
(names of body works and reports received by the public security fire agency or already operational)
Construction of firefighting facilities:)
Fire alarm system mouth auto-spray fire suppression system
Fire-proof separation of mouth-to-mouth cooling system foam-to-mouth gas-to-fire-fighting system
Emergency lighting at the mouth of the system and fire communication equipment at the mouth of the evacuation instruction system
Other fire-fighting facilities at mouth moving fire-fighting system entrances
Note: in the selected object box, no。
Article iii: objectives of contract execution
Contract scope based on national and local technical specifications for building fire-fighting facilities in
(c) repair and maintenance to ensure its proper functioning。
Article 4: responsibilities of the parties
A. Liability: provision of a full set of construction accommodations approved by the public security fire agency within the scope of the contract
Completion of drawings and legal clearance of all fire-fighting facilities; assumed due to the subject of the contract
Quality problems or maintenance costs valued at over $100 during use, and metaphones annex
Replacement costs first (except for one-year warranty period); responsible for day-to-day running of fire-fighting facility systems
B. Liability: in accordance with national and local regulations and technical regulations governing the construction of fire-fighting facilities
Pang, provide repair and maintenance of fire-fighting facilities within the scope of the contract for a
Frequent failure (except for factors such as resistance to natural disasters and man-made damage); scope of contract internal
Fire-fighting facilities, in addition to regular maintenance, following notification of failure of fire-fighting facilities
Visits to maintenance should take place within 24 hours; contract coverage should be reported regularly to a and fire agencies
The operation of internal fire-fighting facilities
Shared responsibility: compliance with and enforcement of national and local laws and regulations relating to the construction of fire-fighting facilities
Technical specifications; common agreement and implementation of the code of maintenance for the repair and maintenance of building fire facilities; regular co-location
Also report to and be supervised by the public security fire service on the operation of the persons under contract。
Article v: duration of contract execution
This contract shall run from the month of january to the month of january。
Article 6: contract amounts, payment modalities
Contract amount: annual fire repair and maintenance costs per person (dn$ capital)
Method of payment: if this contract enters into force with the signature of both parties, the date of entry into force of this contract shall be
Payment of % ($. 00) to b within the first week of the first month of the year for maintenance for the current year;
In the first week of the seventh month of the first year of the contract year, the first party will then pay the second party the original
Additional annual maintenance costs per cent ($. 00); contract year 2 and year 3
Such push。
Cash-for-transmittance checks, bank receipts and wire transfers
Article 7: liability for non-compliance
The parties shall not terminate the contract without cause or, in case of default, by the defaulting party in accordance with the non-performance portion. ]
50 per cent of the contract amount was paid to the other party for breach of contract
3 per cent of the total amount of the contract if party a fails to meet the time limits stipulated in the contract
Payment of late payment to b; if b fails to perform maintenance duties as contracted, as contracted
A total of 3 per cent of the total amount was paid to party a in default。
Article 8: other
This contract shall be signed by the legal persons of parties a and b or their delegated agents. ]
Effect. Four copies of this contract, two each of which shall have the same effect
A copy (print) of the case was also filed with the public security fire agency。
This contract has not been settled by mutual agreement。
Article 9: signature by the parties
A: b:
Representative:
Year h:
Model contract for the construction and maintenance of firefighting facilities
Contract number:
A: high school seal
B: engineering ltd
Day
In accordance with national and local regulations and technical regulations for building fire-fighting facilities
The barrier-built fire facility is operational and the contract for maintenance is signed。
Article i: parties to the contract
A: secondary
B: ltd
Article ii: subjects of contract
Zen (name of body works and registration by the public security fire agency of the a-face or already operational)
Fire-fighting facilities:)
The fire alarm system mouths automatically spray the fire suppression system mouths
The cooling system mouth foam fire suppression system mouth gas suppression system mouth fire separation system mouth protection against smoke
Mobile fire suppression system for the system-door emergency lighting and evacuation instruction system-door firefighting communications equipment mouth
Other fire-fighting facilities
Note: in the box for the selected object, click " , without "
Article iii: objectives of contract execution
Contract scope based on national and local technical specifications for building fire facilities in

(c) repair and maintenance to ensure its proper functioning。
Article 4: responsibilities of the parties
A. Responsibility for providing all construction facilities under contract approved by the public security fire agency
Legally qualified completed drawings and all firefighting facilities; assumed due to the subject of the contract
Quality problems or maintenance costs of over $100 in the course of use, as well as metalloids annex
Replacement costs, first (except for one-year warranty period); day-to-day running of fire facility systems
(b) discovery of problems and immediate notification to b and provision of necessary work for b to perform this contract
P; b is paid for maintenance in the amount and manner specified in the contract。
B. Liability: in accordance with national and local regulations and technical regulations governing the construction of fire-fighting facilities
Pang, maintain and maintain fire-fighting facilities under contract provided by a
Frequent failure (except for such factors as resistible natural disasters and man-made damage); scope of contract internal
Fire-fighting facilities, in addition to regular maintenance, after receiving notification of failure of fire-fighting facilities
Visits to maintenance should take place within 24 hours; contract coverage should be reported regularly to a and fire agencies
(b) the operation of fire-fighting facilities
Co-responsibility: compliance with and enforcement of national and local laws and regulations relating to the construction of fire-fighting facilities
Technical specifications; common agreement and implementation of the code of maintenance for construction of fire facilities; regular co-location
The performance of the persons under the contract is also reported to and supervised by the public security fire service。
Article v: duration of contract execution
This contract covers the period from to
Day。
Article 6: contract amounts, payment modalities
Total amount of contract: maintenance of fire-fighting system under this contract, capitalized rmb: wu wan
It's not like i'm going to be able to do this. Retention under contract。
Method of payment: this contract enters into force for both parties at the first year of the contract
Within the first week of july, 50 per cent (2925. 00) of the current year's maintenance costs were paid to b
A further 50 per cent (2925. 00) was paid to b in the first week of the seventh month of the following yearo
Cash-for-transmittance checks, bank receipts and wire transfers
Article 7: liability for non-compliance
Parties shall not terminate the contract without cause, if the breach occurs, by the defaulting party in accordance with the non-performance portion. ]
5096 of the contract amount paid to the other party for breach of contract
3 per cent of the total amount of the contract if party a fails to meet the time limits stipulated in the contract
Payment of late payment to b; if b fails to perform maintenance duties as contracted
The amount of 3 per cent was paid to party a in default。
Article 8: other
(a) this contract shall enter into force on signature and seal on behalf of or on behalf of a legal person of both parties;
(a) each of these contracts shall have the same effect in three copies as each of a and b
This contract shall be reported to the public security fire agency for filing (copy)o

This contract has not been settled by mutual agreement。
Article 9: signature by the parties
A: b:
Representative:
Time:
Model contract for repair and maintenance of construction firefighting facilities4
Contract number:
Place of signature:
Signature:
A (trust, depositor):
Party b (underlay, underwriter):
Under the civil code, the fire law of the people's republic of china and the mountain
The east province fire regulations are subject to the following agreements, negotiated on a case-by-case basis。
Name of maintenance building:
Ii. Scope of maintenance:
Party b is responsible for building fire-fighting facilities in the following buildings:
Repair。
1. Construction of fire separation and safe evacuation facilities
2. A fire alarm system
3. Fire-fighting water facilities
4. Dismantling systems
5. Fire artillery systems
6. Automatic water-jet firefighting systems
7. Gas fire suppression systems
8. A water spray automatic fire suppression system
Foam-fighting systems
10. Smoke-resistant, smoke-smoking facilities
11. Fire-fighting electrical and communications facilities
12. Fire elevators
13. Dry powder fire-fighting facilities
14. Mobile fire extinguishers
15. Other facilities. Details (see list of building fire facilities)
Iii. Duration of maintenance:
From day to month
Time. If both parties wish to extend the maintenance period before the expiry date
Maintenance period