The temperature is rising and the number of people to be renovated is gradually increasing. In recent days, a number of netizens have left messages under the chinese business community and the public, wondering how much the renovation is about and what needs to be prepared
It is not only about the renovation company, but also about the owners, who need to think about how quickly and efficiently to complete the retrofitting process, since it can only be better matched if the process is clear。
With regard to the renovation process, as mentioned earlier, to help more needy owners, the chinese newspaper correspondent interviewed a number of designers and project managers in the city, summarizing a super-practical renovation schedule
1. Inspections: rollers, calculators, notes ben
The renovation is preceded by a first-inspection inspection to ensure that there are no cracks on the walls when the developers turn in, sewers are not blocked, heating pipes are not leaked, etc., and problems are not detected after the renovation. These items are to be made available during the inspection and renovation of the house: a roller, which measures the wall, the size of the material at any time; a calculator, which is to be used for all budget purchases; a notebook, a bookkeeping, a record of the materials to be purchased and other care ... A local camera or mobile phone requiring a photograph is to be recorded at any time。
2. Commencement of work: check of construction map confirmation budget
It would be preferable to cross-check the construction plans before commencing work, with the aim of more accurately calculating the renovation costs. There is also a clear concept of space for the selection of home-based products, in order to avoid any undue expense, by once again defining the area to be renovated, particularly the area to be covered by bricks, the area to be painted, the area to be covered by wallpaper, the area to be covered by the floor, the size of the main wall, etc。
3. Main dismantling: selection of wooden doors production
Main demolition consists mainly of the demolition of walls, the building of walls, the shoveling of wall skins, the removal of heaters, the change of doors and windows, etc. Dismantling waste is done in a timely manner to ensure interior cleaning and to facilitate construction. Once the major dismantling is completed, the wooden doors must be identified quickly, while attention is paid to custom branding, and it is desirable that the entire house be identified with a clothing room, a freezer, etc。
4. Hydropower rehabilitation: cupboards, water heaters
Water and electricity improvements are buried in walls and cannot be changed at any time. It is therefore important to determine the location of switches, lamps, basins, baths, washing machines. Prior to the retrofitting of water and electricity, the cabinet designer came to the door and measured the power supply, the water route, the water heater model and the location of the power supply and interface. On the wall below the water basin, it is advisable to keep power outlets to facilitate water purification and soft water. If a new wind system and central air conditioning are needed in the home, it would also be advisable to locate the power lines with the designer before the hydropower upgrade。
5. Kitchen bag tube: it is recommended to select furniture at this time
Pipes are used mainly for sewers such as kitchens and toilets to isolate noise. In view of the humid environment of the cooks, it is important that the materials of the pipes are not used with wooden bones, mostly with red bricks, which are more traditional, but are more spatial and not recommended for small households. A framework can be used for light steel dragon bones, with cement pressure plates, wired wires and tiles attached. This component of the construction can also be used to look at the furniture at the mall to determine the consistency of the style of the renovation. It is recommended that the furniture be set at this time。
6. Wattsmen: fix a leak before fix a bath
This part of the valet is mainly referred to as tiles. You have to buy a leak when you paste a brick. When you're done with waterproof, hairproofing, you're ready to put bricks. When tiles are laid, the excess material in the sutures of the tiles should be scraped in a timely manner, and the surface stains of the tiles should be wiped out with wet cloths, thus avoiding the problem that the stains of the tiles could not be cleaned after the renovation。
Once the tiles have been pasted, it is possible to order ablution products such as a bowl, bathroom cabinet, toilet, etc., and to arrange a second visit by a cabinet designer. Essentially, it ensures effective interface at later stages of installation。
7. Carpenter: paint must be painted
After completion of the work, the carpentry should enter. To be precise, the carpentry will be able to enter once the water and electricity renovation is completed. When making a background wall, the wooden bones should be fixed and checked to be solid before a plaster plate is formed, with a gap of 0. 5 to 0. 8 cm between the two plaster plates to prevent the expansion of the arch。
In paintwork, attention must be paid to coloring. The colours are lighter than colours and must not be the same or deeper than colour cards, and it is best to see whether the colours are suitable in person before painting walls. The walls are painted at least twice, some three times more, and the walls are painted in a darker colour。
8. Wallpapers: keep the windows open for 48 hours
After the painting of the wall, the oil union painted a basic membrane where the wallpaper was needed, which was dry the next day, and then asked the master to put the wallpaper. The wallpaper should be kept out of the window for 48 hours to dry slowly. If something goes up, it has to be fixed in time. It is recommended that panels, outlets and lamps be purchased at this time。
9. Switches, cooker's crane installation: selection of multipurpose plugs and aluminium buttons fuck
Basic improvements are almost over. At this point, it is possible to proceed with the installation of a switch plug panel and to select a multi-purpose plugin that can be used for both holes and three holes. The cooker's hoist better buy the aluminum hook, which looks high. The quality and performance of the pvc buttons are common, and the cost of this part is generally low, and the price is suitable for direct purchase。
10. Custom entry of cabinets: confirmation of size and installation
The cabinet will be customised from the beginning of the renovation until this is the real installation. In the case of cabinets, it is advisable to arrange for smokers, stoves and tanks to enter the field on the same day, if necessary, so as not to be of late size. On the day of the installation of the custom furniture, it would be preferable for the owner to go to the site and check the correctness of the brands sent, on the one hand, and, on the other hand, to stop in time if there were problems with size, colour, etc., so as not to detect problems once the installation is complete。
Installation of wooden doors, floors: avoidance of cracking pong
It is proposed to proceed in this order: in front of wooden doors, floors, hangers, bathing hardware, etc., are complete. If air conditioner holes are involved, the holes are drilled in advance to avoid the dusting of furniture. The wooden doors are then the floors because of the complexity of the door-dressing procedures, the combination of pages, locks, door suction, door frames, etc., and the numerous tools used, such as the floors, are easily touched。
12. Cricket sewn, clean up: avoiding the destruction of tiles, cleaning equipment, etc
After the entire construction was completed, the tiles began to sew, which kept the tiles clean and more beautiful. After stitching, cleaning is requested before the furniture enters the area. This includes, inter alia, the cleaning of doors and windows and stains that cannot easily be removed from cleaning and renovation. From tiles to kick angles, one house and one house. It would be preferable for people to be present at the scene to avoid the destruction of tiles, detergents, etc., with steel silk balls or strong corrosive cleaning agents。
13. Furniture, home electricity entry: protecting finished products
All basic renovations are completed, and the bed, mattresses, closets, shoe cabinets, sofa, table and home electricity are ready for entry. The furniture should be protected by the finished product before entering the site, for example by covering the floor with protective film to avoid scratching the tiles and wood floors. The surface of the wall should be covered with bumps。
14. Curtains, soft clothing, accessories: dots and accompanies open windows
When all the furniture enters the premises, curtains may be installed and decorated rooms may be purchased, such as wall paintings, displays, etc. The purchase of decorations avoids a pattern that is too strange or sharp. A new home with a green tree will be perfected. Of course, when the new home is installed, at least three to six months after the window is opened。