Overview of the report
Distinguished leader:
In order to maintain normal office order in our unit, improve the quality of the office environment and ensure the safety of the lives and property of our employees
It was decided to apply to your office for renovation of the existing premises. As reported below:
Next:
Ii. Background of the renovation
The existing office building in my unit is the upper structure of the frame shear wall. Approximately
21,000
Hemmy
2002

In use. Owing to the age of the project and the lack of day-to-day use and maintenance, office accommodation is currently available
Next question:
1.
The outer wall problem: large cracks and rises in various parts of the outer wall, cracks between tiles and walls, rain
The impact and internal pressure resulted in the fall of tiles and damage to vehicles. It's not just an accident
The impact of frequent office is significant and seriously endangers human lives and wealth。
2.
(c) the problem of the roof: the water-protecting section of the top floor has reached its useful life, the information is seriously ageing and it is fractured in many places. Every
In the rainy and snowy weather, water seepages and leaks occur to varying degrees, resulting in some office leaks and damage to roofs
In particular, there was a serious leak in rooms such as the archives。
3.

Ageing of water lines: ageing of water lines throughout the office building due to age and current technical conditions
The connections and valves were damaged, the links were in the walls and the repairs were not convenient. It is proposed to change the code to one that will facilitate maintenance。
I'm sorry.
Ground garage problem: water infiltration in parts of the ground garage, resulting in greater humidity and impact
Vehicle usage and parking。
5.
Elevator and fire-fighting system problems: long operating hours of elevator and fire-fighting systems, security hazards, need to be performed
Testing and maintenance。
Iii. Reform context

In response to the above, we propose the following improvements to the office premises:
1.
Refurbishment of the outer wall: refurbishment of the outer wall in such areas as cracks, rises and falling tiles to ensure the safety of the outer wall。
2.
(c) house repair: waterproofing of roof floors to address water seepage and leakage。
3.
Retrofitting water lines: alteration of water pipes, replacement of connections and valves and improvement of water quality。
I'm sorry.
Refurbishment of the underground garage: refurbishment of the permeable areas of the underground garage to reduce the humidity of the garage。