Overview of the report
Distinguished leader:
In order to ensure the comfort and safety of our office environment and to improve the efficiency of our work, in accordance with the constitution of the people's republic of china
The law and related laws and regulations such as the regulation of construction permits for construction of building and municipal infrastructure works, combined with
In view of the current status of our office building, a request for maintenance of the building is submitted. The specific situation is reported below:
Ii. Project background
1.
Basic information on the office building: my office building is a framework shear wall high-rise building, building space approximately
21,000
Mi, u
2002

Yearly operational. The building was built according to the design standards and requirements of the time and the period of service was reached
12
Year。
2.
Problem:
Fragments of external walls, leaks in houses and garages, damage to underground pipelines, ageing water lines, electricity
Issues such as the ageing of switches are serious。
Elevators and fire systems need to be tested and there are security risks。
There are large cracks and rises in the outer walls, cracks between the tiles and the walls, and they act in the rain. Internal

The force was squeezed, resulting in a small drop and a car crash。
The top floor is protected from the aging water, with multiple cracks, with varying degrees of water seepage and leakage in the rain and snow
Rain。
The water lines are ageing, the connections and valves are damaged and the repairs are not easy。
Get out of the car and store it in safety。
3.
Impact: these problems not only affect normal office use, but also present serious security risks and have even emerged
A minor accident。
Iii. Maintenance context
1.

Exterior wall maintenance: external wall detection, repair, including crack repair, tiles replacement, etc。
2.
Waterproofing of the roof: complete renovation of the waterproofing section of the roof, including the waterproofing, thermal, etc。
3.
Retrofitting of water lines: ageing of water lines, including replacement of pipes, repair of connections, etc。
I'm sorry.
Power system retrofit: ageing of power switches to ensure the security and reliability of the power system。
5.
Elevator and fire system testing: comprehensive testing of elevators and fire systems to ensure their proper functioning。