Restatement of the cost overrun on vehicle operation and maintenance
Report of the secretary-general
The following is the main text of the overhaul report on overexpenditures in vehicle running and maintenance:
First: "a car after sale "
Triple motor repairs ltd
Refine the report
Distinguished luishan city shipping authority:
On 26 june 2012, your heads visited my department for a special overhaul. To me
General information on the division and current status
The scene was examined in detail
A lot of valuable comments and a lot of shortcomings were found on the site
Our division will cooperate actively with you in response to your questions
Reformulated:
1. To disseminate information on the implementation of the laws, regulations and regulations on safe production
Regulations. Full
Reform measures: the laws, regulations and regulations on safe production have been put on the wall。
2. Lack of safe production responsibility and safe production management
System。
Reform measures: this system has been established and is on the wall of the system。
3. Lack of technical staff, electrical appliances, painting ...
The examiner. Full
Reform measures: technical certificate, electrician certificate, painting certificate, medical examination certificate, implemented。
4. Part of the protocol is missing。

Corrective measures: modified protocols。
5. No hazard screening programme. No hazard screening project
Do it. Full
Reform measures: an inventory schedule and a risk checklist have been developed。
6 “three single certificates” are not regulated。
Corrective measures: the “three single certificates” are now being completed
7. Two fire extinguishers are invalid。
Corrective measures: fire extinguishers have been replaced。
In view of the inconvenience caused to your leadership by this incident, i am deeply sorry
Meaning. Thank you very much for your valuable advice on the development of our division
Hope for the future
And give us more support and guidance. Thank you
Thank you
The car shall be repaired with limits
Year ii: self-remediation report on safe production at a garage
Report on all the products of the plant, which had been set up in the land, and the car repair plant
At the request of the transport department of the county, the plant reports the following safety checks:
1. Monthly security meeting at our factory, which requires that every employee
He shall perform his duties and shall bear his responsibilities. And have specific precautions in place
Measures。
2. For high temperatures, heavy rain, heavy wind and lightning, etc. Days
Gas characteristics. Organized a full hazard screening
Temperature, severe rainfall, wind, lightning, etc
Equipment facilities in case of accidents, site screening, elimination
Security risks。

3. Regular scheduling of mid-points in the plant area, with focus points
Check, find out in a timely manner if the fire facility is ready
Good. Is the evacuation passage clear? Fuel, oil storage
Checked for safety, mechanical equipment, etc
Checked and, at the same time, ran water and electrical circuits
Eliminate security risks。
4. Strengthening of vehicle safety management and prohibition of unauthorized driving, alcohol
Back-drive or sick operation to ensure vehicle safety。
5. Enhanced security education training, with weekly meetings emphasizing security
The importance of work. All practitioners trained to secure
Full production should be notified. "three know": on duty
Catalytic hazard factor, possible accident; own safety
(b) the functional and job safety protocols and related security regimes
How to deal with an anomaly and know what to do after an accident. Response
Quick escape and rescue。
6. Any vehicle entering the plant must be inspected before it is repaired
Leaks, omissions and assignment orders
Workers sign. (a) clear accountability and security awareness
Maintenance is carried out strictly in accordance with the operational specifications for secondary maintenance. Do it
To complete the maintenance project, the facility must be used
Spare parts, without false or secondary items, to ensure maintenance of vehicles mass
Quantity safety
7. Strict implementation of the vehicle maintenance certificate system, per vehicle

All of them were tested by a tester, signed by the inspector
A certificate of qualification is required to be completed before leaving the plant。
8. Strengthening dynamic designation of productive business sites
Responsibility of the professionals
Field custody。
9. Establishment of emergency response teams, based on actual improvement of the unit
“peace in all matters
Urgent plan。
We'll be strictly required, regulated and safe in the future. Fan
Better in production. Wallyin and car repairs
8 july 2013 title iii: reorganization of the transport department at the workshop
Report
And the car of ambez was repaired with a limited jurisdiction
Security and safety
Sanya city maintenance office:
18 january 2013, head of the municipal directorate of security and maintenance
Take responsibility for safe work in my company for the year 2012. Contents
A test and a security risk to my company
One noted that our company was required to adapt to existing problems. I'm..
The company's leadership has issued a rectification order from the city security board
The following modifications were made by the quickly organized personnel:
1. To request the heads of the production workshops to emphasize to their employees that
When you're done with the acetylene, you have to separate the acetylene from the oxygen