Detailed principles for various types of projectilers
The method of projectile work is the basic element that many users who have just been exposed to projectiles want to know. Only when the details of how the projectile works will it be possible to better choose the suitable projectile。
I. The working principles of the anti-ballistic parts。
1. The rationale for the projectile。
The projectile is the main component of the projectile parts. The projectile is made up of parts such as leaves wheel, breaker wheel, direction pack, main axis, etc。
The iron pill is rotated by the flow of the funnel into the rotor, which rotates at the same speed as the main axis. Under centrifugal force, the iron pill is pressured to the inner side of the directional condom, when the iron pill reaches the directional rectangular window, it is thrown out of the window, taken over the fast-rotationed blades and moved from the inside to the outside, and later fanned to the casting at 60 ~80 m/s, thus cleaning up the surface of the casting. Repositioning the directional window will change the direction of the ironball ejection so that the castile can be thrown to the casting as far as possible. The misdirectional position not only reduces the efficiency of the projectile clean-up, but also increases the wear and tear of the arc shield. The size of the targeted package will affect the proliferation angles of ironballs (spreading horns), the greater the export, the greater the proliferation angles, and the less effective the clean-up. Therefore, the rectangular window of the orientation suite needs to be adjusted in a timely manner and replaced when the wear exceeds 13 mm。
The main parameters affecting the efficiency of the disposal of the projectile are the speed of discharge and the amount of projectiles. The higher the speed of the projectile, the greater the force of the blow; the greater the amount of ball casts per unit of time, the greater the intensity of the iron ball cast over the area of the casting unit. The effect of increasing the ejection speed distance. After the iron ball is thrown out of the projectile, the speed will gradually decrease during the exercise due to air resistance. In general, the loss of the kinetic energy of the iron ball is increased by about 10 per cent for each additional metre. Usually, the surface of the emptied casting is appropriate at a distance of 0. 7 ~1. 5 m from the centre of the projectile, where the bullet is too deep and the ejection area is too small and the cleaning effect is reduced at too long a distance。
2. The rationale for separators。
Mixtures from the combat lifter flow from the fabric spiral to the upper part of the sub-constituency, from which the fabric spiral enables it to flatten the fabric along the separators over the entire length of the sub-constituency to form a fallout like the waterfall. At the same time, the excavator excretees through the wind vent of the separators, using a gravity wind selection, effectively separates bulletballs and type sands, metal oxidation fragments, shredded bullets, dust and then enters the silo after a second filter from the bottom of the screening net, stores them and enters the next cycle。
In the process of decline, the plume mixture is pushed to particles by horizontal air currents, resulting in an oscillating curve trajectory, with varying degrees of tilts due to differences in the size and particle size of the particles, which allows for the separation of the plume, the purification of the dust by the inhaler, the entry of shreds, sands, skin oxidation, etc. Into the waste storage, and the re-sifting of the scavengers and parts of the small scavengers into the pellets for recycling。
The better separation effect of separators is achieved by regulating the position of the hammer on the plate, the position of the plate on the board of one* and two*, and the butterfly valve on the plate, which can reasonably achieve a good separation effect of more than 99 per cent。
The shelving vehicle consists of a gearing needle wheel speed-retarder, a spiral axis, a conveyor shield, a seat-drive bearing, etc. This component has been serialized, universal, interchangeable and reliable, and the entire spiral has been welded as a whole, thus ensuring the congenerity of both ends of the spiral. This component is an important component of the equipment's shell-cycle system, using 16-mn material for spiral blades, which are processed and stretched by special processes, with precise spacing and outer dimensions, which increase the life of the spiral and reduce the running noise。
The axle of the shelving is equipped with pulse wheels to detect the operational status of the tracking of the shelving and, in case of malfunctions such as jamming, the signal is sent back to the plc, alarms or a gradual parking to ensure the safe operation of the equipment。
The choice of bulletballs is directly related to the clean-up effect of the work and the surface quality of the work, and the particle size and materials of the projectile are selected depending on the cleaning work。
3. The principles of combat lift machines。
The fighting lifter consists of a wheel-to-roller, up-to-down roller, a conveyor tape, a cauldron, a closed shell and a tighter。
The feed mouth of the fighting lifter is linked to the spiral transmitter and the feed vent is connected to the separators。
Welding structures are used to increase the shell. Upgrading aircraft casings are equipped with overhaul doors to repair and replace lifting equipment. Opens the doorcap on the shell to repair the movement of the lower part of the shell and removes the underside of the bullet. This machine rotates with a belt. At the time of the operation, the plume, which is attached to the conveyor tape, scrapes the pills at the bottom of the lifting machine, then delivers them to the top of the lifting machine, then drops them in a centrifugal manner and puts them into the ball sand separator。
In order to ensure that the tape is not smoothed at work, the roller is made into a rat cage, which increases both the friction between the tape and the wheel, avoids the slide of the old-style skin belt wheel, reduces the pre-heat pressure of the belt and prolongs the useful life of the tape lift. At the same time, the lifter has a set of liftings. When the belt is loose, the tight belt can be increased by regulating the adjustment bolts on both sides of the lifting machine。
The lower axle of the lifter is equipped with a pulsed wheel to detect the operational state of the tracking lifter and, in the event of failure of the lifter, to provide timely feedback to plc processing to ensure the safe operation of the equipment。
4. The working principles of the spiral transmitter。
Helix transmitters consist of lined wheel-reducing machines, spiral axes, conveyor covers, bearing bearing bearings, etc。
Yoshikawa has been serialized, with high generality, interchangeability and reliability, and the entire spiral has been welded as a whole, thus ensuring the congenerity of both ends of the spiral。
The spiral transmitter transports the shellballs collected from the bottom plume to the combat lifter. This component is an important component of the equipment's shell-cycle system, using 16-mn material for spiral blades, which are processed and stretched by special processes, with precise spacing and outer dimensions, which increase the life of the spiral and reduce the running noise。
Ii. Rationale for the various types of projectiles
1. The working principles of the tracked projectile。
After adding the item to the clean-up room, the machine is activated, the work is driven by a roller, the work begins to be flipped, while the projectile is thrown out at high speed into a fan beam, the average blow is on the surface of the projectile, thus achieving the purpose of the clean-up by ejecting the bulletballs and the small holes of the grains through the rubber belt, flowing into the bottom of the sheet net screen, being sent into the lifting machine through the screwdriver, being separated by reference to the separators, the dust being pumped from the wind to the dust remover, which is removed by the devader, so that the dust that falls into the dust tank can be removed on schedule. Waste sand is released from waste pipes and can be recycled by users. The pelvis mixture is recycled from the fallow tube into the chamber and is to be used after separation by the separators, and clean projectiles are to be thrown through the emp gate。
2. The working principles of the hook projectile。
When the hook projectile works, the machine commences normal work when the preparatory work (dedust removal system, lifting machine, spiral transmitter, etc.) is completed. * first, the hook drops the lifting, rises to a certain position, then enters the projectile clean-up chamber along the orbit, stops when it reaches its intended position and starts to rotate. At this point, close the door to the projectile clean-up room, open the projectile, open the testosterone, and start the projection clean-up. This process is repeated until the work is completed and is stopped sequentially。
3. The working principles of the projectile projectile。
When the machine is activated, the projectile dropped at high speed forms a fluid beam that strikes the surface of the projectile in a balanced manner, thus serving the purpose of clean-up and reinforcement. The projectiles and grains thrown into the lifter are separated from the lifter to the separators. Dust is pumped from wind machines to filter in the scrubber, clean air is drained into the atmosphere, dust on the bags is twitched mechanically into the dustbox at the bottom of the scrubber, the user is regularly cleared, the waste is discharged from the waste pipe and the user is reusable. The pellets are recovered from the back tube into the chamber, which is then reused after separation of the separators, and the clean projectiles are thrown through the emp gate into the projectile。
4. The principles of the road projectile。
Road projectiles are not driven by compressed air, but by electro-mechanical projectiles, which use high-speed projectiles dropped from the projectile to clean or reinforce the metal surface. Road projectiles can clear the various residues on the surface of metal works, and castries can be sanded, cored and cleaned. The pellets are grinding materials at the centre of the wheel, which are pre-dumped by shifting blocks (regulator) and impellers, and are thrown out at speeds greater than 100 m/s, and because of the greater coverage of the pellets, the energy efficiency is much higher than the dust spray. Leaf wheels are the heart of the projectile machine and are driven directly or indirectly by electric motors, and each manufacturer of the wheel has a unique design, divided mainly into single and two-disk wheels. The yoshikawa road dumping machine used high-speed bullets dropped from the projectile to clean or reinforce casting equipment on the surface of the casting. The projectile is capable of distilling, removing and cleaning the casting together. It is mainly the high-speed rotation of the wheel that throws the ball sand out, and the high-speed impact of the parts on the surface to meet surface treatment requirements。
5. Activation of roller-ball projectors。
The roller-by-roller is mainly used to throw the bulletballs on successive flip-backed parts of the roller, using a high-speed wheel, thus serving the purpose of cleaning the project and falling within the scope of the casting machine. It applies to dust, rust removal, de-oxidation and surface enhancement of castings up to 15 kg in various industries。
Roller-type projectors are used to clean up a variety of non-crash, scratched castings, exercise items and are ideal equipment for small thermal processors to clean the surfaces of the work, skin oxidation, consisting mainly of rollers, separators, projectors, lifting machines, speed-reducing machines, etc。
6. The working principles of the switchboard projectile。
The rotor consists mainly of the room, the switchboard, the moving system, the separators, the lifter, the fallow device, the projectile, etc., and a high-speed rotating projectile on the roof of the room, with a better position ejection of the work, which can be seen directly as it moves out of the room, so that further work can proceed。
The shaving plate is rotated by a moving system, the ball is transported through the fluid tube to the lower part of the lifter, which is separated by reference to the separators, the perfect projectile is used continuously through the vasectomy and the gate for the projectile, and the fragmentation and dust are then entered into other corresponding pipes for secondary separation。
The conveyor apparatus is driven by a wheel-and-roller wheel, which causes a smooth rotation of the rotor by a friction transfer between a clutch and the switchboard. When the work is transferred out of the room for direct flipping and cleaning of the work, it is also possible to pull off the handle, remove the grinding wheel and switch, depending on the difference between the cleaning work and the ease of loading and unloading the work, that is, to stop and change the position of the work and then start to turn again。
7. The working principles of a chain projectile。
Suspend-by-ball projectors are primarily used for the treatment of projectiles in large quantities. In structural form, it can generally be divided into consecutive passages of the q38 series, ordinary chain-steps of the q48 series, accumulation chains of the q58 series, etc. The method of work is that the parts can be continuously operated, step-by-step, or used in advanced lifting-to-staff transport, so that the parts can be stopped in the loading and unloading and in the projectile areas, respectively, so as to achieve the stationary handling and point-to-ball disposal processes, which, depending on the item, can weigh 50 to 2000 kg per unit, with high productivity and reliability, and so that the large-scale clean-up of various types of portable parts is highly appropriate. Such as the hood of the engine tank, the electric case, the gear, the motorcycle motor case, the tail frame component of the bike, the shift frame component, the hardware tool case, the water pump, etc., have been particularly effective. It is an ideal option for automobiles, tractors, diesels, electrics, valves, etc. It can generally be designed to meet user product requirements。
8. Activation of neutron projectors。
The main functional components of the neutron projectiles are pre-defunct, cleaning rooms, wire-oriented devices, projectiles, bullet-circle systems (including lifting machines, separators, spiral transmitters and flow adjusters), blowers, dust removal systems, electrical control systems, etc. The four high-speed, strong-powered projectiles thrown from the projectiles are used to strike the rapidly moving surface of the line and remove the rust and oxidation layers above them from their surfaces. The clean-up surface is free of iron oxide and meets swedish standard sa2-2. 5* and the work surfaces are metal-neutral。
The neutron oscillator principle, the aoshima yoshikawa heavy-working line oscillator, is cleaned up for continuous and efficient operation, and the wire is drawn by external power, which, after pre-correction of the rectangles, is brought into the ejection area of the cleaning room, where it is struck and polished by a strong and intense projectile, with a quick depreciation of the skin oxide, the rust layer and its stains, and the surface of the line is provided with a slightly rough, light surface. The projectile is transported from the recovery spiral to the projectile cycle system. In the course of the clean-up, the drop-off of the pellet dust mixture is assembled through the chamber funnel, the vertical horizontal spiral transmitter, which is then elevated to the upper separators of the machine, and after separation is dropped into the separators' plume for recycling. Dust is generated in the cleaning of the projectiles, which are sent from the windpipe to the dust removal system, and the clean air is released into the atmosphere and particulate dust is seized and collected。
9. The principle of stone-painting machines。
The stone projectile was cleaned up for continuous high-capacity operations and processed in large quantities, and when the aoshima yoshikawa ishikawa projectile was brought into the projectile area of the cleaning unit by an electrically controlled transformer-driven windway during the cleanup process, it was struck and polished in various parts of its body by strong and intense bullets from different coordinates, prompting the oxidizing skin of the work piece and its stains to fall off and obtaining a slightly rough light surface. The bullets and rust that fell on the projectile are channelled through the recovery spiral to the projectile cycling system, and are handled by both sides of the cleaning room。





