Introduction - - - - - - - - - - - - - - - - - - - - - - 2

Ii. Use of equipment and specific points - - - - - - - - - - - - - - 3

Key technical performance parameters - - - - - - - - - - - 4

Iv. Methodology - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

V. Structuring of equipment - - - - - - - - - - - - - 6

Vi. Equipment operations - - - - - - - - - - - - - 9

Vii. Equipment provisions - - - - - - - - - - - - - - - - 9

Viii. Maintenance and maintenance of equipment - - - - - - - - - - 9

Business profile

He has a master's ultrasound department and pharmaceutical equipment

Housekeeping. My division is dedicated to expanding ultrasound equipment and pharmaceutical machine products to a professional level

High-tech joint-venture enterprises formed as a result of diversification, serialization and scaling up are the shandong provincial science commission

• identify high-technology enterprises. The jeining sein's ultrasound limited is a collective producer and researcher

Large ultrasound and pharmaceutical equipment enterprises, producing and developing, attract new workers abroad

Arts technology, world branded raw materials, metaware, and large-scale non-label applications plc, touch

Full automatic ultrasound scrubber, gas phase and electro-brain control on the screen and the working brain control screen

Mechanical arm making, needle production line, frozen dry production line, oral liquid production line, fully automatic glue scavenging

A full variety of ultrasound cleaners and pharmaceuticals such as dryers and ultrasound core cleaners. Set

Ready. Prominent enterprises rely on “good faith” as a source of security and are therefore more professional due to good faith。

It's called "technology start up, keep going, client one, quality one, credit one."

Our spirit, our chief of staff, continues to attract leading technology and good technology

To serve each and every one of our clients in good faith. Pun

Friends join hands to meet new developments and futures。

I. Use of the equipment and specialization

The sy-gs rubber scrubber is a researcher at my plant

It's designed and constructed to regulate the electro-mechanism. Set

Ready。

This equipment uses xc3-24t-e series programmable controls produced by an advanced iqu enterprise

The manufacturer (plc) acts as the master controller and operates with an electro-touch screen, all

In chinese, easily. You can preset it while cleaning. Just press run

Activation of the tape cleaner

Key, the whole process can be automatically completed. There are semi-automatic and manual alternatives

Options are available。

Equipment has a compact, small size, performance and operation capability, all of which are critical components

Use 304 stainless steel. Recycle pumps, controllers, touch screens, frequency transformers, etc

Use imported parts。

Key technical performance parameters

Production capacity: 20,000 units/boxes

Input mode: manual

Iii. Resources: automatic

4. Major velocity adjustment range: 0-10 x/minute

V. Purge methods: rough washing, cleaning (heated injection, ultrasound cleaning)

6. Cleaning time control: 0-999 minutes mutable

7. Main transmission power: 1. 5 kw (variable frequency modulus)

8. Cycle pumps: 0. 75 kw

9 ultrasound power: 3kw

Total power of equipment: approximately 5kw

Equipment reference dimensions: 2200 x 1900 x 1900 mm

Iii. Rationale

It's about manual, semi-automatic, automatic transition. Default to semi-automatic after system startup

Status. If you are running manually, please enter manually and then run manually; all

Automatically, dot semi-automatically above manually automatic, i. E. Fully automated, then dot

You can see the individual states。

Auto-run process: glucose plugs are added to the pail by the feed, feed and water

When the water level reaches the specified level (ceiling level), the water level sensor moves

The water is automatically stopped. Turning the scroll in sync

Open the ultrasound, wash it in the prescribed time, then open the drain valve and take the sewage out. Line

Drain drain, bottom limit sensor moves, drain valves automatically shut, rough wash

Over. And when the water reaches the upper limit, all stop

And then we're going to clean it up, and we're going to turn it on in a roller, and we're going to open it up, and we're going to take it in

When it's full, open the ultrasound, do it in the time set

We'll split up, open the drain valves, when the water's clean, we'll call the police and clear it

The material key carries out the material action and then press the material key once it's finished。

2. Semi-automatic operations:

2. 1. Water flow, water flow, main power is turning, when the main power is reaching the feed limit

When the main power is shut down, when the high water level is detected, and when the main power is stopped

Start calling the police. We're out of water。

Activation of the tape cleaner

2. 2 blank washing, first to detect high water levels, and if not, to open the water for water

When the water level arrives, the system works according to the time set

When it arrives, it closes the ultrasound and opens the drain valve, and when it reaches the lower level, closes the drain valve

Main power is down, alarms are down。

2. 3 cleaning, first checking for water, then opening the valve if the water is not below the level

Water, when the water level arrives, the spray, the ultrasound, the main power is being synchronized

By-water, work is done at the time of the scheduled ultrasound cleaning. In the course of work, if the water's hot

When it arrives, turn off the ultrasound, turn off the water, turn off the spray, open the drain valve, reach the water level

When the line was down, the main power was shut down, the water valves were shut down and the alarms started to alert the police。

2. 4 the main power plant is operational and will be shut down when it is complete。

Iv. Equipment structuring

The washing machine is constructed by the main transformer, the main transmission axis, the cleaning barrel, the cleaning tank, the cleaning tank. Water

Components such as pumps, water filters, ultrasound exchangers, and electrical control components are structured reasonably

Operation so。

1. The moving device controller is an imported frequency modulator, small in size and wide in speed range

Operation so。

Cleaning drums are cylinders full of sifts, with a mixer, back end and movement

Main axis link。

3. Cleaning tanks are full-sealed stainless steel formations with spills on the side walls and sprays on the top

Episodes, external loop pumps and filters, with sewage pipes at the bottom。

4. Water circulation systems on the side of the host, with electromagnetic valves of different sizes, complete

The drainage is controlled automatically by the electromagnetic valve, and the recycled water exports are filtered and sprayed through the canopy

Enter the box to ensure clean water quality。

Equipment protocol

Figure ii

1. Start with the parameter setting, as shown in figure ii, before the device works

The screen set the menus with a thick wash time, a clean time, the main power is on the switch

The main generator reverses the frequency, at which point it can operate automatically or manually。

Manual mode: manual method is also semi-automatic and manual. It's called semi-automatic

This is the first time that the project has been launched. It's like feeding, baptism, etc. So-called hands

The movement is directed at each of the implementing agencies, such as the main electric power, the water intake valve, the drainage valve, the pumps, and the direct opening。

This method should be used with caution and importance for debugging because it does not have a chain protection function set

A special place. Here's a semi-autometric approach

The action profile of the structure is as follows: (as figure iii)

Figure iii, figure iv

Activation of the tape cleaner

Default to semi-automatic status after system startup, start--stop the switch button on the panel first

Play in "starter" position, press a semi-automatic run in main image four, that's half

Automatically. Note: the start/stop button on the panel is automatic, semi-automatic, manual medium

It all works, and the equipment works on the premise that it starts/stops to the starting point。

A. Feeds: press the feeding into the water key, and the inflow begins. Main power is turning, turning

The speed is positive

Sensor action, main power stop. You can open the feed window at this time, insert the casket, and proceed

Plus. When the filling is complete, the cauldron will be removed and the door closed; when the water reaches the upper limit

At that time, the water is stopped; at this point, if the water reaches the upper limit and locates the sensor movement, the water will not enter

We're done with water feed. Call the alarm light. Call the alarm. Cheng

It's over, we can go on a little trip。

Note: it is important to remove the feed to perform other operations. (except water)

B. When the feed is complete, press the touch screen button, as required, for example, for rough washing

Cleaning and material production is done in accordance with the established procedures。

C. Output: press the "output" key, the main power is running in reverse frequency, and when the material is finished

And then you're gonna have to press the fold. There's a stop button in the feed mouth

You can stop feeding。

Figure v

3. Automatic approach: self-propelled semi-autonomous processes; water intake - rough washing - cleaning

- call the alarm. - press the material. Feeds

The running pointer is in each section, and the pointer is currently running。

4. Relevant state surveillance. It's on the right side of a semi-automatic and automatic picture。

Vi. Equipment provisions

Power 380v, 3x4

2. Ionous water 42> 0. 4 mpa

Vii. Maintenance and maintenance of maintenance

1. Main transfer axis bearings are multi-point axis bearing structures, operating at high temperatures, lubricants

The volatilization is faster, with an appropriate amount of lubricant on the outside surface before each run. Current watch

When the oil in the face and axis rings is dry, the cleaning bearing shall be removed and refuelled。

2. Water resistance pressure of filters not less than 0. 2 mpa shall be washed or replaced with filter cores。

3. Crude filters should be checked once a month and efficient filters should be checked once every six months。

If the wind is reduced or the wind pressure limits are limited, it should be cleaned or replaced in a timely manner。

The cleaning tanks should be cleaned regularly to ensure their cleaning。