The reason for the failure was that the main power source was too low and the electricity was out of supply in an instant. When the power is cut, the voltage detection circuits fail. In this case, the external voltage is checked first. If not, emphasis is placed on checking the power circuits or power circuits of the drive plate and reporting 13 malfunctions of the loose drive maintenance. In many cases, it is the capacitors of power circuits. Or problems with the triodes and alerts, or do not appear when used. We have also experienced many such situations. Why did you stop the rotation?
There may be some malfunctions in the use of the loose servers, such as the sudden non-rotation of the machines in use. Why don't you wait for the power? How do you respond? The speed and location of the control can be very accurate. The voltage signal is converted to a rectangular and velocity to drive the control object. Some malfunctions may occur when using loose servers. There may be a number of reasons why the power is not rotated。
Approach:
1. Unreasonable setting of the additional reduction time constant;
(b) the lack of electrical rectangulation and the reduction of power voltage, which makes the server unable to start;
3. External power to service axle rotation;
Ii. Twirl limit selection error: as twirl limit, it is proposed to enter the twirl limit (n-atl/p-atl) treatment:
1. When external input is used, external input pr5. 21 is set to 0, n-atl is imposed to-9 and p-atl is imposed to +9。
When using parameter values, set pr5. 21 to 1 and a large value in pr013。
3. An error in setting the command pulse and multiplication. (location... Closed rings): whether the pine server is conducting a command pulse input according to the scheduled movement。
Approach:
1. Reconfirmation
(b) the setting of pr0. 09. Pr0. 10. Pr5. 00-pr5. 02。