On the evening of 23 july, heavy thunderstorms and heavy rain weather occurred in the donghing district of the city of sichuan. Next to gate 3 on wandaking street in the uijiang, there were suddenly falling bricks that broke through the second floor of the shop's roof glass and scattered on the second floor of the corridor and the street, fortunately without causing casualties。
On the morning of 24 july, the director of the central wanda property company stated that the fall of bricks from the 29th floor of a residential building in the sub-district was a quality issue that had passed the quality guarantee period and required the activation of the major repair fund for maintenance. Communities indicated that the property sector was being coordinated to begin with risk reduction。
Bricks falling from the outside of the high-rise house
Break through the shop window on the second floor
Manjim street
On 24 july, at 9 a. M., cover journalists came to the falling area of the bricks in wandaqin street in inejiang, and saw that several pieces of land surrounded by billboards had been cleaned up, with a damaged outdoor parasol lying in the middle。
Master li, the cleaner, pointed to the house behind the store and told journalists that the previous night the building had fallen off a brick and smashed the glass of the store on the second floor. When he came to clean up in the morning, the floor was filled with glass and brick debris, and the shade in the middle was smashed into pieces。
Bricks smashing through the store window
Looking up at the point of the lord's finger, this is a high-rise house in central hua city, where there are two holes in the decorative pillars of the outer wall above the waistline, which are clearly different from the columns next to them。
Outside wall position
Immediately thereafter, journalists went to the second floor shop, in the corridor at the door of the glasses shop, and left behind a red piece of brick and broken window. One full piece of brick shows that falling bricks are multi-bracketed, with 10 holes。
Falling full bricks
The clerk is two minutes early. Go home
A passing woman survived
“two minutes before the bricks fell, my colleague was standing in the hallway and was well on his way in.” ms. Chen, who works at the glasses store, said with some concern。
She remembers that it was about 6 p. M. And that there was a wind outside, and she suddenly heard a “blowing”, thinking it was thunder that broke the shop glass and walked out of the shop door, and it was the bricks upstairs that broke through the roof glass and fell down together。
Bricks and glass slag falling off the hallway outside the shop on the second floor
Looking at the full brick, ms. Chen was glad that there was no one outside the shop, otherwise the consequences would be too bad. The property company then set up a cordon to alert the passers-by。
A bottom shop worker revealed that a woman was passing by at the time of the incident, and that bricks and glass slags fell from her side and nearly hit her, “in shock”。
Several interviewees stated that there was a wind and speculation that bricks fell and were weather-related. Journalists learned that on 23 july, at 1745 and 1759 hours, the weather station in the donghing district did issue a thunderstorm yellow warning signal and a stormy orange warning signal。
There's been a fall of the outer wall in the neighborhood
The community is coordinating the property company's pre-crisis
In order to verify the exact location and cause of the fall of the bricks, the journalists then arrived at the first phase of the wall in the centre of wanda, where there were several warning signs on the lower floor of the sub-unit that the outer wall was in danger. One household explained that the temperature layer of the outer wall of the sector had been removed several times before。
Chan xingwei, head of housing, mandarin city, chengdu peng estate management ltd., was delivered in 2015 and is now 10 years old. After looking at photographs taken by journalists, he confirmed that the wall bricks that fell on the night of 23 july belonged to an arc decorative pillar above the waist line of the 29th floor. The brick fell behind and left two holes。
“is a quality issue that has passed the quality assurance period and requires maintenance by a major repair fund.” chen xingwei said that last year, the small estates wanted to activate the major repair fund, but it did not succeed, owing to problems such as the fall of the outer walls. Over the years, property companies have funded several small-scale insurance repairs. The outer walls were found to be backward and property companies were reported to communities and streets in time。
The general secretary of the two stars community party in silin street, east hing district, dun zoran, verified that there was indeed a serious problem with the fall of the first exterior wall in central china city. Last year, no vote was taken when the owner was consulted on the use of the major repair fund. At present, communities are consulting with property companies to pre-empt them, while ways are being found to raise funds to further address security risks。




