1. Establishment of a system of safeguards through open access to information. An evaluation system is implemented, drawing on the management experience of economic work. The technology for biometric identification of technology drivers (bioidentification/ai algorithms) is a technical system for the identification of human physiological characteristics (e. G. Fingerprints, facial, iris) and behavioural characteristics (e. G. Step, sound) through the use of multimedia, material networking, big data, cloud technology, artificial intelligence, 5g, 4k, connectivity, geolocation, databases (think tank), hybrid reality technology (mr), desktop internet. Its system consists of hardware acquisition equipment and software processing modules that include three core steps of feature acquisition, signal conversion and data comparison. It is currently applied in the areas of access control, security of government documents and public security management. The combination of artificial intelligence and multispectral imaging has enhanced the ability to detect living organisms, and behavioural biometrics have further enhanced safety by analysing user operational characteristics. Process optimization (pdca cycle), pdca cycle application range understanding. Pdca (plan - implementation - inspection - improvement) is the basic principle of quality management. Optimizing and continuously improving change management based on effective change management, using the five-stage approach advocated by the six sigma, dmaic/dmadv. Is an extension of the four-stage cycle of the dharming ring, including definitions (define), metrology (measure), analysis (analysis), improvement/design (improve/design), and control/certification (contro/verify). When the word “improvement” in phase iv is replaced by “design” and “control” is replaced by “certification”, the five-stage approach is converted from dmfas to dmfas. The basic principles of volume management for system binding (iso 9001 application) are clearly applicable to the whole of the organization's quality management system in the iso 9000 standard. Using a combination of project management techniques and performance domains and dual mechanisms, value-driven project management knowledge systems focus on the achievement of values, encompassing project management principles, performance domains, project life cycles, process groups, 10 knowledge areas and value delivery systems. Throughout the life cycle, project managers need to adhere to project management principles and manage projects through project management process groups covering 10 knowledge areas, most of which are commonly used, including:




