Station maintenance 24-hour helpline 400-8769-589

Service areas: su-chun, ka-sun, hai-salt, heining, ping lake, kiryu and the streets of the entire city of south lake
If the internal wind is not hot during heat preparation, the switch valve may not be changed or the wind engine is not activated, the pressure decay test should be applied to the air conditioning refrigeration system by checking the switch valves and wind turbine circuits for sealing verification, protecting 30 minutes for the monitoring of air conditioner readiness using a digital power meter without leakage, and for the route insulation of abnormally leaked parts. Use refrigerant purity detector to analyse recovered refrigerants and ensure recycling safety
Free quality assurance (reference instructions or three packages)
The principles of quality and customer-to-client business are always upheld. Satisfactory quality of service, maintenance technology, good credibility, maintenance masters who have been working for many years, have accumulated extensive maintenance experience and have reasonably accurate and fast maintenance and repair capabilities for air conditioning. All branches of the city have access to services, holidays, and more details are available for consultation
Analyze the working state of the compressor by electrostatic warming curves, predicting axle bearing wear and lubrication. The insulation of air-conditioning power lines is detected using a digital universal meter for insulating circuits below safety values. The internal wind is intermittent during heat preparation and may be broken or alien to the wind channel, which will require the overhaul of the wind machine and the cleaning of the windway. Frequent decomposition of external engines during heat preparation may result in frequent frosting or system pressure fluctuations, requiring inspection of frosting circuits and detection of pressure。
Service policy:
Three waivers:
1, free of charge
2. Unreserved and free of charge
3 the warranty is free。

Three publics:
1. Services policy disclosure
2 the failure points are public
3 the rates are public。
Service in three provinces:
1, when time is saved, on call and on time
2. Rest assured, client-friendly
3. Save money, three free services for clients。

Three times:
1, contact and come to the door without disturbing the population at a time convenient to the client
2 , after diagnosis, and fair and reasonable pricing based on failure
3 quote first, maintain first, the customer knows the price before consumption and understands consumption。
Three, no
1. Unsafe and unsanitary, safe work
2 no cure, no cure, no maintenance, no aftercare
Three, no maintenance, no waste of a penny on clients。

Principle of fees:
1. Repair of maintenance fees
2 unrefinable and free of charge
3 checks are not fixed and fees are charged. (check fees: $30 for general household electricity, $50 for wall-mounted stoves, variant air conditioners, air conditioners
Aukema refrigerator reporting process:
Customer failure - >corporate and send workers >corporate and contact customers to check problems and offer >corporate and send employees to check problems >corporate and check problems and offer offers >corporate and complete maintenance complete user confirmation of signature of warranty >corporate visits to customers >corpoise confirmation of maintenance results >corporate access to warranty
We: a system of good faith compliance with the rules of the industry, a rigid level of technology, transparent fee rates, service security, choosing us is the choice of comfort. Just one phone call for the rest of us to do。

I. Telephone check-up for aucoma refrigerator
If a customer discovers that there is a problem with household electricity, he can contact us in a timely manner, and we'll be at home at *。
Registration appointments
To describe the failure of the aukrema refrigerator appliance in order to send the right person to solve your problems. You need to describe the type, brand, model, malfunction, and your contact information and address. I'll talk to you about service hours。
Time to come in
The place of arrival on time, according to an appointment for door service。
Iv. Inspection failures
The electrical failure was checked prior to maintenance in order to neutralize the disorder. Maintenance was tested and checked to determine the cause of electrical failure。
V. Determination of costs
Before formal failure is resolved, the cause of the failure is reported and the cost of repairing the failure is reported, so that you can count. At the same time, you can give up maintenance because the price exceeds the budget. If maintenance is abandoned, we will not charge a fee (except where previously agreed)。





