You know what the technique of installing a new air conditioner unit is, it's easy to install a new air conditioner unit, and the more functional the new wind unit is, the more expensive it is. When you install the new wind unit, you have to install it according to its type, and today you are presented with the method of installing the new air conditioner unit。
Central air-conditioning new wind unit installation
The new winds unit is an air conditioning device that provides fresh air. Functionally, the requirements for the use of the environment can be consistent and wet or simply provide fresh air. The working method is to remove fresh air from the outdoors, which is transported to the interior through a wind machine after treatment such as dust removal, wetting (or wetting), cooling (or heating), etc., and to replace the indoor air when entering indoor space. Of course, the functions mentioned above will have to be determined according to the need to use the environment, and the more fully functional they are, the higher the cost。
1) before installation, the manufacturer should first read the sample of the product provided and the instructions for the use of the installation, with a detailed description of its structural characteristics and installation elements。

2) the construction unit may be consulted to check whether the load capacity on the floor is sufficient。
3) determination of the suspension programme. In general, when the wind and weight of the crew are small and the vibration of the crew is small, the top of the crane is connected to the floor by an swelling bolt, and the bottom of the pole is connected by a bolt with a rubber defibrillation cushion. In the case of a new wind unit with a high wind load, "the weight shall be such that certain safeguards shall be applied。
4) select the size of the pole to ensure the safety of the crane。
5) take appropriate mitigation measures and, in general, between the winder inside the new wind tank and the bottom shelf of the box, a deviation device has been installed. For smaller-specified aircraft, and in cases where the team itself has a weak deviation effect, the crane may be directly connected to the group's cape with bolts and gaskets; in the event of greater vibration by the team at the time of commissioning, a deviation device shall be added. (a) specific measures: first, a reduction in the convulsion between the crane and the crew by pasting the rubber mattress on the lower side of the cap; the second is the installation of a booster spring in the middle of the crane, which will be more effective。

6) when the crew is installed, particular attention shall be paid to the direction of the crew's entry and exit wind and water, and to the correct direction of the filter extraction, in order to avoid unnecessary errors。
7) when installed, care shall be taken to protect the threads of the connection to the pipe, the cooling pipe, and to bind the sealed material so as to ensure the closeness of the connection to the pipe and to prevent leaks in the connection to the pipe, and to protect the thermostats of the condensed disc from being exposed。
(8) the crew shall be reconciled after installation to maintain the crew level。
9) there shall be a gradient (greater than or equal to 0. 005) in connection with the condensed pipes of the crew to allow smooth discharge of the condensed water。

10) once installed, the crew shall check whether the wind engine is functioning in a balanced manner and whether the wind engine is moving in the right direction, while the cold thermal exchange is not leaking。
11) wind vents of the crew shall be connected to the wind pipe in the form of a tarp hose。
12) when the crew is installed to perform a hydraulic test pressure, the air should be discharged through a venting plug in the upper heater to ensure the smoothing of the system pressure and the water system。
This is where the introduction to the installation of the new air conditioner unit is made, and you are aware of the techniques used to install the new air conditioner unit, which, in addition to the ceiling, has a new wall-mounted wind unit, a standing new wind unit, and so on。