Hello, welcome toPeanut Shell Foreign Trade Network B2B Free Information Publishing Platform!
18951535724
  • Section 09, new guangway maintenance manual 15-huanwan all

       2026-03-10 NetworkingName730
    Key Point:09 new genway maintenance manualThe windshield was cut with a winch and a wirehead until the cutting line was even with the wirehead。The arrow indicates the operational path of the cutting line。15. A wreath head (1) of the winch is placed in the vehicle。The top beam connecting the upper right area. Note: check if the cutting line is correctly placed on the winch。Inserts moving thorn claws and pre-stamp cutting lines

    09 new genway maintenance manual

    The windshield was cut with a winch and a wirehead until the cutting line was even with the wirehead。

    Master's manual

    Master's manual

    Master's manual

    Master's manual

    Master's manual

    The arrow indicates the operational path of the cutting line。

    15. A wreath head (1) of the winch is placed in the vehicle。

    The top beam connecting the upper right area. Note: check if the cutting line is correctly placed on the winch。

    Inserts moving thorn claws and pre-stamp cutting lines。

    16.

    Cut off the windshield。

    Note:

    Placing of lubricants on a ramp; in the windshield radius

    The cutting must be done with greater force to avoid damage to the lined roof

    And plastic sheeting。

    The windshield was cut with a winch and a wirehead until the cutting line was even with the wirehead。

    The arrow indicates the operational path of the cutting line。

    17. A wreath head (1) of the winch is placed in the vehicle。

    The roof of the car connecting to the left area. Note: check if the cutting line is correctly placed on the winch。

    Inserts moving thorn claws and pre-stamp cutting lines。

    18.

    Cut off the windshield。

    Fixed and mobile vehicle windows

    4-31

    Note:

    Avoid damage to the liner and plastic sheeting on the roof of the vehicle。

    The windshield was cut with a winch and a wirehead until the cutting line was even with the wirehead。

    The arrow indicates the operational path of the cutting line。

    19. A wreath head (1) of the winch is placed in the vehicle。

    Connect to the center of the windshield. Note: check if the cutting line is correctly placed on the winch. Inserts moving thorn claws and pre-stamp cutting lines. 20. Two wreaths (2) of the winch were placed inside the vehicle. Connects the lower left area of column a. Note: check if the cutting line is correctly placed on the winch。

    Inserts moving thorn claws and pre-stamp cutting lines。

    21.

    Cut off the windshield。

    Note:

    Put lubricant on the ramp, around the corner of the windshield

    You need to pull more when you cut

    Cut the windshield with a winch and two wire heads until the cutting line is even with the collarhead。

    The arrow indicates the operational path of the cutting line。

    Two wreath head (1) of the winch was placed in the vehicle。

     
    ReportFavorite 0Tip 0Comment 0
    >Related Comments
    No comments yet, be the first to comment
    >SimilarEncyclopedia
    Featured Images
    RecommendedEncyclopedia