
Qingdao news network (reporter chen zhiwei) lungquan high school is in the process of re-structured construction, jing mau elementary school is in the process of securing external walls, installation of pipes, laying of a network of rain-water pipes, construction of the main structure of the northern district of the chinese medical hospital, and internal renovation of the second people's hospital... On april 16th, the government of mok district reported to the entire region in 2024It's trueQuarterly progress。
ImprovementsEducationTeaching conditions
To accelerate the construction of a new high school in dragon springs, and to implement the construction of five primary and secondary schools, including the kimu primary school, to improve the level of quality and balanced development of education. Establishment of a new 37-person industrial intelligence education laboratory to achieve full coverage of the region-wide general primary and secondary level artificial intelligence education curriculum. (c) increase the universal childcare facility childcare subsidy rate to better meet the childcare needs。
Progress: two structural works are under way at lungquan secondary school. The jin mo primary school is in the process of securing external walls, installing pipes and laying a network of rain and sewage pipes. Secondary structural construction is under way at the blue valley centre centre. The experimental school has been expanded, the library building has been demolished, the decorated building has been demolished and construction garbage is being cleared. New secondary schools have been expanded and temporary entrances are being set up. The blue village centre primary school complex is undergoing secondary structural construction. An implementation programme has been developed for the artificial intelligence laboratory construction project. The childcare services subsidy has been raised, a survey of the operation of the institutions has been completed and the actual number of people enrolled is being counted。
ExpandMedicalResource availability
The construction of the northern district of the chinese medical hospital, the second people's hospital, the tuberculosis control centre and the hot spring health hospital has been accelerated, with a view to promoting a balanced distribution of quality medical resources. (c) expanding the coverage of contracted services for family doctors and providing home-based services for the elderly, the disabled and the “third-rate-lower” population。
Progress: construction of the main structure is under way in the northern district of the chinese medical hospital. The second people's hospital is being renovated internally. The tuberculosis control centre is in the process of re-structured. Basic construction of the complex is under way at the spa health complex. (c) to expand the coverage of family doctors, who are working with older persons and persons with disabilities。
PerfectTransportNetworking system
Construction of 4 municipal roads, such as the south of the camp road, rehabilitation of 8 roads, including the second road, 4 roadwalks and 19 priority crossing points, rehabilitation of 11 bus stations and improvement of urban access. 12 comprehensive rural road upgrading projects to improve rural road conditions。
Progress: the camping south transit project (the river to the talent complex) has been completed for the river to the primary school section of the lake, and other sections are being pre-processed. The south passage project (central north passage to sector) is in the process of being pre-processed. Work is under way on three road access projects in the urban areas to prepare the roads and lay a network of rain and sewage. Major repairs are being carried out on the 2nd-wishi river road (highway to high-speed). Four roadwalkers have been rehabilitated and are in the process of dismantling the pavement and organizing the road. A total of 12 road blocks have been refurbished, completing 4 road blocks on blue roads and mirror street, blueway and tiani mountain ii, blueway and shop hill ii. Seven traffic junctions were micro-sanctioned and work was under way to construct the junction and move the trees. Twelve township roads have been upgraded and installations are being secured and traffic signs installed. Seven roads for oil remediation and the rehabilitation of the port of crane road bus terminal are in the process of being pre-processed and work is planned for mid-april。
Improving the living environment of the population
To improve the quality of the living environment of the population by upgrading 17 old housing complexes. The construction of 20 five-star areas for the classification of household waste to improve the environmental health of the population。
Progress: 17 old subsectors are being upgraded and work is under way to keep the outer wall warm. The creation of 20 five-star waste classes has created three five-star classes。
Public safety of the population
Renovation of 6. 4 km of old gas pipelines and free replacement of gas meters for 12,000 households. Replacement of six road lights, including the river ho, and road traffic safety management and lighting security maintenance works to secure the movement of the population. Conducted 2,450 quantitative and qualitative food safety tests and 25,000 rapid tests to combat food violations。
Progress: gas facility renovation works, cumulative upgrading of 4 km of old gas pipelines, and free replacement of networked gas meters for 3,000 households. Roadlight security repairs have been completed, and the green new highway, the mexi entrance, and the peacock river have been lighted and upgraded. :: road traffic safety risk management project, tender announcement. Food safety tests, with a cumulative number of 450 quantitative and qualitative food tests and 6,000 rapid tests。
Care for special groups
(c) the construction of 79 community (village) old-age services and the expansion of the food allowance to 65 years and older. (b) increase the standard of in-patient childbirth benefits for urban and rural residents from $1,000 to $3,000. To improve the quality of life of families of persons with disabilities by implementing barrier-free rehabilitation for 40 families of persons with disabilities in difficult circumstances。
Progress: the bill for the grant for hospital delivery has been completed. Construction of 79 community (village) old-age services has begun. Expansion of the old-age feeding allowance has resulted in a programme of project implementation. The family of persons with disabilities in difficult circumstances has been made accessible and 40 families have been identified。
Enhancing flood resistance
Work has been carried out on the rehabilitation of 22 small and medium-sized reservoirs, such as song cien, mau city and pudong, to enhance reservoir capacity for water conservation and water security. Dismantling and rebuilding of 6 medically dangerous gates, repair and strengthening of 40 priority pond dams and enhancing regional flood control and drainage capacity。
Progress: the sone spring reservoir has been undergoing the process of resuscitating the post-dam slopes with an overall image of 95 per cent. The relocation reservoirs were upgraded and tender notices were issued. 20 small reservoirs to be repaired and repaired, 6 medically and dangerously removed reservoirs to be rebuilt and repaired, and 40 priority ponds to be repaired and repaired are in the process of developing a project implementation programme
Advancing beautiful villages
Twenty-one new city-level beautiful village demonstration villages were created to upgrade the rural habitat environment. Implementation of 28,000 rural households for clean heating and the provision of safe winter heating for the population。
Progress: 21 municipal model villages for beautiful villages have been built. Twenty-eight thousand rural clean-up and heating projects are under way in 2100 households。
Enabling employment entrepreneurship
In keeping with the employment priority strategy, 22,000 new jobs were created in towns, 500 in policy support for entrepreneurship, and 4,000 in policy support for flexible employment, promoting the growth of entrepreneurship among the population。
Progress: 5433 new jobs in towns, 93 policy support for entrepreneurship, 825 policy support for flexible employment。
Expansion of leisure and fitness facilities
Seven new urban pocket parks were built to enhance the quality of urban greening. The opening of 36 new urban and rural school playgrounds effectively meets the daily physical fitness needs of the population。
Progress: 7 urban “ pocket parks”, topography completed. Thirty-six additional school playgrounds are open to the public, and offers of tenders have been issued by the district institutes。




