Buying a new house or trying to redecorate your house. Do you know how to fix it? If they do not know, they are going to tell you about the details of the steps and process of the renovation and 36 details to avoid regret。

Steps for the renovation of houses
Step one: renovation contract with the company
Prior to the home renovation, the general owner is required to select a company and enter into a renovation contract with the company to ensure the legality and reasonableness of the renovation. However, for owners who have not experienced renovations, the provisions of the renovation contract are not clear, which would result in the company drilling gaps and infringe upon the owner's interests. The following is a review of the process by which the renovation contract was signed, by way of note, and how it was written。
Process for contracting for renovations
The process of entering into renovation contracts is generally divided into five main steps, namely, business negotiation, commissioning of design contracts (initial), full programme design (in-depth), budget, finalization of materials (detailed) and signing of contracts for works, a process whereby owners and renovation companies express their personal fit-out needs and claim their personal interests, which requires particular attention, as described below。

1. Business transaction (1) design workflow interpretation; (2) customer basic requirements discussion; (3) presentation of fee formula; and (2) commissioning of design contract (initial) (1) on-site measurement records
(2) preparation of preliminary plan for the plan, tops; (3) design of initial programme communication and finalization; (3) design of the package design (discussion) (1) preparation of detailed design maps; (2) design map communication and finalization; (3) preparation of budget document; and (4) budget, final (detailed) material (detailed) (1) applicability discussion of building materials
(2) the project budget document confirms; (3) the construction materials form is drawn up; (5) the contract for the project is signed (1) the formal contract is signed; (2) the drawing is sent to the ministry of works for filing; (3) the material is prepared。
Ii. Conclusion in contracting a contracting contract

1. The uncompleted written works of the company are required to provide the owner with a mutually agreed construction budget, a complete design package and a construction drawing, all of which are valid elements of the contract. The partial renovation company entered into a contract with the owner for the renovation, in which the written documents were not complete, creating a risk for the subsequent domestic fit-out work。

2. When the main subject of the contract is not clear about the contract for the renovation, it is necessary to fill out the name and contact details of the one and the other, and many companies have only the name of the company, which must be required to fill and verify the contents. In addition, care should be taken as to whether the name of the refurbishment company corresponds to the name of the company stamped after the contract and to prevent the “guerrilla construction team” half-way stand。

3. In order for the renovation to proceed smoothly, the obligation of both parties must be set out in the contract. In the course of the renovation, there may be occasional factors that affect the pace of construction, such as safety at the construction site, the condition of the construction personnel, etc., and that should be specified in the contract to make the responsibility of both parties clearer。
Iii. How the context of the context write
1. Identification of the location and date of construction
Specific construction sites, including streets, subdistricts, units, building numbers; construction dates, including commencement and completion dates, need to be clearly indicated in the contract。
2. The construction price is in the course of full packaging repairs, and the price of each material needs to be clearly stated。
3 the construction preparation and renovation company is required to provide the construction drawings, the construction warranty, the construction process, etc。
The obligations of both parties are the most important elements of the renovation contract, and the specific requirements are precise and detailed. (b) clarify how to contract the package, keeping in mind the environmental provisions。

5. The individual renovation projects and the corresponding price per large project need to indicate the price, e. G., utilities works, ground, cranes, etc. As renovations are generally paid in stages, the contract for full packaging repairs includes a list of the amounts paid by a after it has completed the stage of work by b, when the lump sum will be paid。
Liability for non-compliance

The consequences of the non-compliance of both parties are to be stated, in addition to the circumstances in which the full packaging repair contract may be terminated, the duration of the work may be delayed, etc。
Step two of the renovation: measuring the area and determining the design of the house
The first measure would be the size of the living room to be renovated, including the construction area, the paint area for the wall, etc., and the budget for furniture specifications. Once the size is fixed, the style of the house can be determined and the owner can discuss the design style with the designer. For example, the designer has developed a general renovation framework in which the owner can inform the designer of his own design philosophy and some requirements. The design will be completed and handed over to the refurbishment company for operation。
Phase iii: main demolition works and water and electricity improvements
The first phase of construction was the main dismantling and electrical and water renovation, which consisted mainly of the demolition of walls, the replacement of heating and the renovation of some of the utilities. In addition, it is important to note that the heavy wall of the house cannot be demolished or drilled during the demolition of the wall, which poses a security risk to the house。
Phase iv of the renovation: wall painting and floor ceiling installation
Upon completion of the water and electricity retrofitting, the wall can be refurbished, including, inter alia, the painting of the wall's grubs and the decorating of the emulsive paints, each of which is to be completed after a dry process has been completed. It is also an important step that the floor can be decorated once the walls have been renovated. The floors are generally installed from the bottom and then extended out. Additional tiles were cut to fit kick lines, thus saving material。
House renovation step five: wood flooring and cleaning equipment installation
Rooms that require wooden flooring should first be fitted or damaged. The installation of wood floors is carried out in such a way as to ensure that the floor is dry and flat. Finally, the installation of cleaning equipment and the arrival of furniture, and the selection of cleaning equipment for purchase, as much as possible, are not only of reliable quality, but also guaranteed after sale. Second, furniture should be selected as much as possible in the same room style so that it does not seem too abrupt。
Housing renovation process
House fit-out process one: start at the bottom. The presence of owners, designers and supervisors is required to clarify the process, acceptance standards and additions and subtractions at the construction site. About half a day. Particular attention is paid to the need to remove items that need to be kept on site, such as air conditioning, furniture, electrical appliances, etc., and the need for owners to inform the chief of staff about their handling。
House renovation process ii: demolition for approximately 3-5 days。
House renovation process iii: water and electricity. If water purification units, garbage disposal units, etc. Are crossed, if there is a warmer and a new wind, there is a need to consult the construction party in order. Note: new winds take two days for construction and heating takes three days for construction. The cabinet measurements, heating and window measurements can be done before or before the bottom. About half a day。
House renovation process iv: water and electricity renovation. Water and electricity tanks, air-conditioning holes and, if any, construction of walls. During the construction of utilities, bricks are selected, windows are replaced and household entrances are measured. About five days。
House fit-out process v: receiving and inspection of utilities. Ready to buy switch panels with an angular valve eight-word valves and a leak. About half a day。
House renovation process vi: filling tanks and cooking wall concrete flats, which can be filled once the water and electricity have been approved. Remember to go downstairs to see if there was a leak. About a day。
House renovation process vii: plaques on the balcony, waterproofing by cooks, closed water tests. During this period, floors can be selected, threshold stones set, stoves prepared to stop the reversible valves and angular sutures for bricks. About 3-5 days。
House renovation process viii: kitchen guard bricks. During this period, the cupboard factory was advised to prepare the duplicates and the doorman was notified of the measurements. Put the bricks in front of the house. Approximately 3-4 days。
House renovation process number nine: flattening of floor bricks or concrete floors. Attention to ground conservation. During this period, water heaters, reversible valves can be installed and gas can be modified. Notify the cook guard to do a door-to-door survey. About 1-3 days。
House renovation process x: plaster for flat wall and top. Watch out for plaster lines. Cleanware, electrical appliances and furniture can be selected during this period. About 2-3 days。
House renovation process xi: oilman scratches (2-3 times). Buy paint before you finish the first time. About 3-5 days。
House renovation process xii: the greasy grinding takes about one day。
House renovation process xiii: painting on both sides. The bottom painting works well to prevent bottom re-alkalination, preservation, and increased paint maintenance. During this period, kitchen guards, chandeliers can be installed; switchboard lamps can be prepared and installed. About 2-3 days. When the basic works are completed, the installation of the main material will follow. Particular attention was paid to measuring and receiving the floors by the merchants of the floors 10 days in advance, to see if the conditions were in place。
The renovation process is 14: cabinets are installed for approximately 1-2 days。
The renovation process is 15: the door is installed for approximately one day。
House renovation process xvi: the floor is installed for approximately one day。
The renovation process of the house is 17: the bath is installed for approximately half a day。
The renovation process of the house is eighteen: the wall is being repaired to provide cleanliness. Free the extra tiles and fix the wooden doors and other mains. We'll find a cleaning company to clean up and clean up. About a day。
House renovation process xix: furniture enters the premises for approximately 2-3 days。
House renovation process xx: completed occupancy。

Make sure you avoid the 36 details that you regret
The renovation is a major project, which, because of its professional nature and complexity, makes many owners prone to errors in the renovation, often regretting it when it's finished. Let's look at the 36 details of the refurbishment that they regret!




These are the minor renovation steps and processes, with 36 details that you regret for the renovation, which you have seen, and which you have learned about。