
In order to clarify the responsibilities and obligations of both parties, the following agreement was reached in friendly consultation between the parties: i. List of contract elements: maintenance and repair of the inventory series categories for the first floor of the north refrigeration refrigerator unit and the refrigeration system for the first floor of the south refrigeration refrigeration refrigerator unit and the refrigeration system for the first floor of the first floor during the first warranty period of the first warranty of the first warranty of the first warranty of the first floor of the san francisco refrigeration plant and the refrigeration system for the first floor of the first warranty of the first warranty of the first warranty of the first floor of the first floor of the first floor of the first floor of the first floor of the first floor of the first floor of the first floor of the second floor of the second floor of the refrigeration equipment and refrigeration equipment for the second floor of the second floor of the second floor of the cooler and refrigeration system for the first warranty of the second floor of the second floor of the second floor of the second floor of the refrigeration refriger refriger equipment and maintenance agreement: free maintenance period of one year, except for abnormal operations, man-made and irresistible factors; 1) refrigerating compressor refrigerated oil, refrigerant replacement and addition; first refrigerated oil replacement in one month of operation, once a year thereafter. The timing is based on usage and the degree of consternation of frozen oil. 2) the electrical pillar of the electrical control box is robust and replaced. Two times a year, in march and september. 3) replacement and cleaning of refrigeration valves. Two times a year, in march and september. 4) to conduct an occasional inspection at the site to capture the potential for failure in a timely manner and to conduct the inspection. 12 times a year (1 per month). 5) exterior condensers washed during summer heat. Two times a year, in march and september. (6) ab party arrives at the site for repairs within 12 hours and at the site for repairs within 24 hours of the national holiday. The duration of the contract: for the period from 6 june 2014 to 5 june 2024, if an extension is required, party a shall notify party b one month in advance of the renewal. (according to the non-conformity of all pipes in the freezer on the basis of an injury test report issued by the relevant department, all pipes in the freezer were specifically maintained for 10 years. (iv) contract price and mode of settlement: one year's total maintenance of the refrigeration equipment is determined by agreement between the parties. The cost of maintenance of cold storage equipment began in the following year at a cost of tens of thousands of dollars per year, and material requirements were borne by a. Method of settlement: 1) after the entry into force of the contract, party b provides a valid national invoice for 10 days and 50 per cent, or $50,000, of the amount advanced by party a for the contract. 2. The repair and maintenance work was completed throughout the year to meet the technical requirements of this contract and, with the approval of the technical staff of a, the remaining lump sum, or $50,000, was paid by a. As of the month of the year. A total of tens of thousands of dollars is owed for the project for the cooling of b. (1) one payment of ten thousand yuan owed by one party after the first year of free maintenance; (2) once the repairs and maintenance are completed in the second year, a makes a lump sum of tens of thousands of dollars owed by b. (3) once the tenth year of maintenance is completed, the party a will pay the amount owed by the party b in a lump sum or, starting in the second year, will pay in the amount of tens of thousands each year; and, fifthly, the duties of both parties will be: (1) to provide for the condition of the cold storage and to facilitate the work of the maintenance staff of the party b. 2) conduct maintenance supervision and quality inspection. 3) strictly implement refrigeration professional operations to prevent unprofessionally qualified persons from operating. Damage caused by a, which is borne by a itself. 4) maintenance materials after one year are provided by a, which provides only skilled workers; b, which is responsible for: 1) a day prior to the monthly maintenance, b, which informs the person concerned. 2) refrigerated compressor refrigerated oil, refrigerant replacement and addition. 3) the electrical pillar of the electrical control box is robust and replaced. 4) replacement and cleaning of refrigeration valves. 5) external aircraft condensers. 6) an occasional visit to the site. 7) training and operational guidance on machine start-up. 8. Refrigeration technical advice. Liability for breach of contract: 1) during the term of this contract, party b shall ensure the proper functioning of the freezer of party a. If b causes the equipment to be abnormally refrigerated, a may make appropriate deductions. 2. This contract is in accordance with the will of the parties and has the legal effect of giving them the performance of their obligations under the contract. Vii. Special description: freon is transparent, tasteless, low toxic, medium constant low, critical temperature high, liquid. Freon and water are almost insoluble with each other and the resolution of moisture is minimal. It is generally soluble in refrigerated oil, but at high temperatures freon is deciphered from the refrigerated oil. Freon r22 is non-fired, non-explosive and safe from ammonia in use. R22 has a volume of about 60 per cent higher than r12 and a volume of cooling and saturation pressure at low temperatures is higher than r12 and ammonia. For safety reasons, the following is provided to define whether there is a leak: 1. Up to 10 per cent of freon is replenished annually, which is normal natural wear (e. G., replacement of valves, oil, filter cores, etc.). 2. More than 10 per cent of freon replenishment per year is due to leakage caused, for example, by loose piping or other valve valves; if maintenance costs arise during the warranty period, they are handled by b, with the exception of human and irresistible factors; if leakage is detected after the warranty period, it is determined, on the basis of actual circumstances, that leakage occurred in the pipe interface and is handled by b. 9. Other: (1) this contract shall enter into force on signature by both parties. The contract costs were fully settled and the contract expired. (2) two copies of this contract, one each. A side: b side: representative: address: telephone: date of contract: number of brand number number numbers for refrigerator price 1 compressor 2 dry filter 3 temperator control 4 magnetic valve 5 refrigerator f227 refrigerator 8 auxiliary nitrogen cleaning fees (welding materials, etc.) 9 dismantling, welding, vacuum, lactation, installation debugment 10 installation 12 maintenance fee (including tax) x total 14 taxes 10 x total (all) 6 (tax) + maintainer: date: 5




