    Key Point:Streamlined version of the model agreement for a crane maintenance contract. DocSubscriber (a): place of signature: trustee (b): time of signature: this contract is concluded between parties on the basis of equality, resources and consensus, in accordance with the crane design code and other relevant laws and regulations, for all parties on the side of a for maintenance with cranes. (1) total (1) single-brand crane-5-0t double-barrelled crane 0-3

    Streamlined version of the model agreement for a crane maintenance contract. Doc

    Subscriber (a): place of signature: trustee (b): time of signature: this contract is concluded between parties on the basis of equality, resources and consensus, in accordance with the crane design code and other relevant laws and regulations, for all parties on the side of a for maintenance with cranes. (1) total (1) single-brand crane-5-0t double-barrelled crane 0-32t semi-trigger 0t crane 0t: preferential price: payment method:

    Ii. Protection standards, content

    1. Daily failure control. (a) the failure of a in the use of cranes and the need for b to deploy at least one of its security personnel to the maintenance site within an hour for timely repair

    Monthly maintenance check. In order to prevent excessive wear and tear and accidental damage to cranes, to eliminate hazards in a timely manner, to keep cranes in good technical condition and to ensure the safe operation of cranes, to minimize the risk of sudden failure. Party b is required to perform an inspection maintenance and record of all cranes on the a side, as required by the state for the maintenance of cranes, from the monthly date, and to rectify any security risks, and to file them with the equipment management by the end of the month upon signature of the person concerned. If there is a significant security risk to cranes that cannot be ruled out by protection, party b shall include a thematic report on the monthly inspection maintenance:

    (1) consistency of control screens, protective boxes, controllers, resistors and wire screws. Exposure and corrosion of the contact, control point. The wear and tear of the brake belt. The connection to the interaxis and the hardening of the screws. The wear and tear of wire ropes used for more than six months。

    Maintenance records for door cranes

    (5) the riser of a double brake, the size of the power rectangular for each brake. The limit switches are sensitive and reliable. The flexibility of hooks and cracks。

    (8) snail hardening and wear and tear of electric electric brushes on the base of electric motors, speed-reducing machines, axle bearings, angular bearings, etc。

    (9) tightening of the steel rope plate screws, wear and lubrication using steel ropes for more than three months。

    (0) wear and tear in the catheter insulation of the tube。

    (1) lubrication of the range switches。

    (2) the amount of oil for lubricating oil in the brake. Brake electromagnetic insulation. The amount and quality of the fluid suppressors。

    (3) balancing the wear and tear of the wire in the wheel。

    (4) lubrication by open gear transfer。

    (5) orbital accuracy and pressure plate hardening of cranes。

    (6) hanging mobile cable connections。

    (7) carbon scrubbing wear and tear in electrical appliances。

    (8) other circumstances affecting the safe use of cranes。

    3. Pre-annual maintenance. Party b is required to conduct a full maintenance of a crane subject to annual inspection prior to the annual inspection in accordance with the annual inspection plan for a single crane, and to ensure that all lifting machines for party a are certified through the technical supervisory authority and are certified for safety. Evidence

    Iii. Responsibilities of the parties and matters agreed upon

    1. On the basis of the technical specifications for the technical overhaul of the national standard bridge cranes, the planned overhaul and maintenance of the bridge cranes, the safety protocol for cranes, the design code for cranes, the guidelines for steel cord testing for cranes, the safety inspection protocol for special equipments, the routine performance check for the contents of the security, monthly maintenance, pre-annual maintenance, and timely participation in and assurance of the normal production of the emergency handling of crane accidents, so that the performance indicators for the entire company's cranes remain within the standard range。

    2. The bw personnel must have the corresponding crane maintenance operation permit, with a dedicated personnel (at least personnel) stationed near the plant area to ensure the quality of service and the safe operation of the crane。

    3b. Protection personnel are required to comply with the relevant rules and regulations on the one hand, so as to ensure that certified induction, conduct, and careful completion of the “maintenance operation report” or “repair operation record” after the end of the operation, are signed by the other party and filed with the equipment management by the end of the month。

    4. The obligations arising from accidents, damage, delay in work, etc., which occurred during the performance of the contract as a result of negligence and technical reasons, are not only in respect of direct bodily injury and direct loss of property of persons on party a, but also in respect of indirect loss, for which party b is responsible。

    This contract shall enter into force immediately upon signature by the legal representatives or delegated agents of both parties and shall have the same legal effect. The period of service shall run from the date of the contract to the date of its natural termination. This contract is in one part, comprising a and b. A: delegate: address: telephone: depositary bank: account number b: delegate: address: tel: depositary bank: account number: tax number:

     