  • Steps and basic processes for the renovation of the gross house

       2026-03-31 NetworkingName1850
    Key Point:Steps and basic processes for the renovation of the gross housePre-design. It is designed primarily on the basis of their own living habits and provides detailed measurements of the house, including, inter alia, a clear description of the area involved in the renovation process. For example, the area of bricks, the area of paint on the wall, the area of wallpaper, the area of floor floor, and the size of the wall where the furniture is clearly pl

    Steps and basic processes for the renovation of the gross house

    Pre-design. It is designed primarily on the basis of their own living habits and provides detailed measurements of the house, including, inter alia, a clear description of the area involved in the renovation process. For example, the area of bricks, the area of paint on the wall, the area of wallpaper, the area of floor floor, and the size of the wall where the furniture is clearly placed。

    2. Dismantling works. The main demolition involves the walls, which include demolition, building, repairing, grinding of wall powder, retrofitting of doors and windows. Preparation for entrance: check the wall, floor, roof level and smooth draining pipes; make construction time and schedule with the renovation company。

    Renovation steps

    3. Utilities works. The water and electricity sector is a very important link, because it is a hidden project that affects the quality of our living conditions. This step includes, inter alia, water and power rehabilitation, waterproofing, air-conditioning vents, cooking gas, etc。

    4. Waterproofing. In the case of flats on the first floor, the toilet floor is not waterproof, so just make the wall. In the case of villas, waterproofing in the bathroom must be done. If your home is ready for heating, central air conditioning or a new wind system, it needs to be installed when the water is ready. Self-built houses need to be aware of leaks in roofs, preferably for waterproofing。

    5. Work on the masonry. These include, inter alia, the construction of walls, the processing of base plating, the laying of wall bricks and floor tiles. If the tiles are to be sewn, do not do so immediately, but wait 3-7 days。

    Renovation steps

    Woodwork. This includes the installation of all fixed cabinets and cranes in the home, such as the fork-off cabinets, cabinets, closets, partitions, etc. Wood works, such as plastering, make-up, ceiling covers, door covers, wall panels, cookers, basalts, plaster ceilings, bathbars, etc。

    7. Painting works. The painting of walls, wallpaper pasting, pasting of walls, top paper, soft decorating, etc., must be preceded by protective work to avoid the spraying of messes, causing problems in cleaning work。

    8. Installation works. These include the installation of finished wood doors, floors, cupboards, etc., locks, door suction, sanitary and hardware accessories, various switches, lamps, cigarette stoves, water heaters, exhaust fans, etc。

    Renovation steps

    9. Complete total acceptance. Dismantling and receiving and, if necessary, coordination of the renovated accommodations as required by the contract。

    Ten. Clean up the waste. It is possible to find a cleaning company, or to work with the whole family, and to suggest that they can come on their own, after all, as their new home and save money。

    11. Entering furniture and ventilation。

     