Air-conditioning repair telephone 029//6898/9055 in west goose towers, air-conditioning installation in goose towers, u. S. Air-conditioning movers, air-conditioning fluoride cleaning maintenance, air-conditioning removal and removal, air-conditioning plus fluoride and snowing, central air-conditioning repair installation, xian air-conditioning and refrigeration ltd., each customer in good faith, to create a harmony that will make a perfect life and a better future for you. Air-conditioning refrigeration is a company that specializes in air-conditioning maintenance, air-conditioning movers, air-conditioning maintenance, air-conditioning cleaning, recycling, new and old air-conditioning, and specialized maintenance of various brands of a dragon service. The company is well-sized and covers the whole of the region。
The company solemnly undertakes:
1 1 year of fluorinated air conditioners (air conditioners)
2. Maintenance of air conditioners for six months

3. Air-conditioning movers, maintenance prices city-wide*, user * trust units
4. If our company moves, repairs air conditioners fail, our company will provide services free of charge to compensate users for their loss.
Noted matters。
I. Test machines: test the normal functioning of air conditioners before moving。

(b) *can be marked at both ends of the connection line without the possibility of faulting the connection during loading。
(c) since used air conditioners are generally covered by dust, air-conditioning movers are required to be careful of the cleaning of the horns and interfaces, to prevent dust from entering the pipes and to prevent congestion during post-movement work. Prior to the installation of the interface, the horn and the inside side should be checked again for any dirty material to be removed before the hood can be covered. If it happens to rain, it is even more important to bind the pipe with plastic bags to prevent rain from entering and causing ice congestion。
4. When an air-conditioning mover removes an indoor machine, it shall prevent the flow of condensed water into the circuit board。
(e) the loudspeaker on the pipe has been squeezed for a long time, and some of the loudspeakers have a very deep ring of pressure on their roots, and they are vulnerable to cracking, pulling off, leaking when they turn on, so that they must be removed and examined carefully, and if they are not qualified, they must be re-extracted in order to avoid the potential。
Vi. Air conditioners cannot be rotated, tilted too far, and are reluctant to use their hands to hold the cut-off valve lift during external handling and installation. In addition to this, care should be taken when moving the aircraft to remove it, to remove it and to remove it from the scientific field, with a proper direction and a medium level of bending。

In re-installation, attention should be paid to the following aspects:
1. Whether the end of the line or other connected areas are relaxed to prevent the occurrence of fires or other hazards, and whether the wire is ageing, if any, to replace;
2. Check for fluorine leakage at the interface, and for machinery that has been in use for a period of time, and in the event of fluoride leakage, oil contamination generally occurs at the leak point;
3. Measuring insulation resistance of air conditioners to prevent electrical leakage in air conditioners;




