  • 18 steps in the family renovation process 18 steps in the order of renovation

       2026-03-31 NetworkingName550
    Key Point:Basic data collectionA key step prior to the renovation design is the basic data collection of the house, with the most accurate base data, which avoids the purchase of wrong building materials at the size of specifications and allows for budget advance planning。2. Framework dismantlingThe first step in the renovation is to break down the walls, change the walls, change the pipes, change the windows, etc., and set up the whole framework

    Renovation steps

    Basic data collection

    A key step prior to the renovation design is the basic data collection of the house, with the most accurate base data, which avoids the purchase of wrong building materials at the size of specifications and allows for budget advance planning。

    2. Framework dismantling

    The first step in the renovation is to break down the walls, change the walls, change the pipes, change the windows, etc., and set up the whole framework。

    3. Electricity and water rehabilitation

    The components of the hydro-electric retrofit will depend mainly on the sound location of the water table, the ease of future interfaces to the pipe, the security risks associated with the installation of pipes and power lines, the ease of future maintenance, etc。

    4. Carpentry

    There are “three brothers” who are essential in the renovations: masons, carpenters and painters, up-to-date masons, then carpenters, and finally painters, who are basically dirty and who comes first。

    Five, bricks

    Until the carpentry has been completed, the mudslides can be arranged, and there will be little conflict between the two。

    Six, paint the wall

    Painters enter the field to complete the basic treatment of the walls, paint the walls and customize the home painting programme for carpentry. In the case of families who intend to carry wallpaper, the painter is requested to prepare a basic wall treatment in advance。

    7. Installation of cranes

    The ceilings of the general household are mainly on the kitchen guard, installed at the same time as the chandeliers, equipped with tide-proof headlights, fans (bathhouses), etc., with wires and openings left for electricians to follow up。

    Installation of cupboards

    Once the hanger has been completed, the shop can be installed at the door, usually in one day. This can be accompanied by gas stoves, tanks, etc。

    9. Wood gate installation

    The wooden doors are usually produced over a one-month period, so they are scheduled in advance and can be installed on the day after they have been installed in the cupboard, so that they can also be equipped with locks, sheets, leaks, etc., and materials must be prepared in advance, otherwise they can easily cause back-to-work and waste costs。

    10. Floor installation

    It is important to see whether the floor needs to be flat and to ensure that the floor is clean and dry before being installed, and with these prerequisites, the floor can be installed the day after the installation of the wooden doors。

    11. Switch plugin installation

    The installation of a switch plugin should follow the basic norm, which is the “line in the right-hand fire”. All plugs are marked, and the l-zero line is a ground sign. Concerns breakers are generally installed on or on line。

    12. Installation of lamps

    Simple lamps will be installed in general by electricians and, if relatively complex lamps are purchased, they will be consulted or invited to the door。

    13, hardware installation

    The early purchase of plumbing, toilet, bath hangers and hangers, etc., and their loading together after the installation of the lamps, were immediately followed by the smell of pyrotechnic fire throughout the home and became alive。

    14. Installation of curtains

    The curtains must be one of their favorite decorations for the hostess, with the curtains closed and the curtains closed, which is the most cozy and secret space of their homes。

    15, furniture in

    Furniture are purchased well in advance and can generally be purchased in accordance with the needs and circumstances of the household upon completion of the water and electricity renovation, it being noted that the size of the furniture must be measured accurately。

    16, home electricity

    To this extent, it has been largely accessible, so the installation is installed at the point of entry for domestic electricity。

    17. Home dressing

    Building a home that is warm, home-based and home-based is essential, integrated with the style of home-based renovations, which add colour and beauty to the home, gives warmth to the home and highlights the taste of the owner。

    18. Sanitation

    After the renovation, go to sanitation!

     