The owner of the first house is often confused about how to fix it. If you don't have knowledge of the new room, you're too busy and you're spending too much money, and this is the place where you're going to describe the new room in detail, so that you don't go around the corner and spend less. The blood and tears of a wider household are shared
(i) tools in place
Before you're ready for renovation, you must have a few things in your bag. Volkswagen (buying 5 m, not 3 m), calculator, large plate (slips, receipts); also, it is advisable to prepare old towels (soft cotton, with bricks and bricks), plastic bags (entangled on a pipe interface, anti-fouling) early on at the site
(ii) choose a good day and let the guns go
Before the workers enter, it is advisable to take a personal survey of the corner of the home, take a note of the ruler and mark it clearly. The main elements of the measurements include:
1. Identify the areas involved in the renovation process. In particular, the area covered by the bricks, the area covered by the wall, the area covered by the wallpaper and the area covered by the floor
2. Identify the main wall dimensions. In particular, later design of the surface dimensions of the furniture will be required。
It's time to buy a radiator
(iii) main dismantling to make space more operational
Main dismantling was the first project, which included, inter alia, the demolition of walls, the construction of walls, the shoveling of wall skins, the removal of heaters, the replacement of plastic windows, etc. Dismantling waste is carried out in a timely manner to ensure the cleaning of the interior and to facilitate construction。
It's time to set the finished door
It's best to walk through the cupboards, smokers, stoves, water heaters and make sure they're okay
(iv) hydroelectric retrofitting to accommodate the use of each space
Water and electricity rehabilitation, no regrets for taking medication. The bricks are on the wall, on the ceiling, and it's hard to get a plug. It is therefore important to determine the exact location of switches, lamps, pots, baths, washing machines, etc。
Before the water and electricity retrofitting, the cabinet designer should come to the door for the first measurement to help you determine the power and water retrofitting programme。
Water heaters, you'd better send someone to design the power, the interface, according to the model you've identified。
I remind you: on the wall below the water basin, it's best to keep a power-plug for cooking treasures。
Air-conditioning holes and power sources are placed on this wall on the bedside as far as possible to avoid subsequent air-conditioning blowing directly into people。
Power and vulnerability should be 20 centimetres apart, for example, between plugs and grid lines
(v) pack pipes, wrap ugly pipes
In view of the humid conditions in the kitchen bathrooms, the materials must not use wooden bones. Be careful, even if it's embalmed。
Remember, a light steel dragon bone, or a red brick. Light steel dragon bones, but red bricks are the strongest。
We need to get tiles, sutures, etc
The furniture needs to be set up early, and it usually takes at least 15 days
(vi) bricking, first thing with a physical sense
Before putting the bricks, buy a good leak。
Note: the leak is to be bought at the orient home, and the peace will not be of much use. Special washing machines or shower leaks are to be purchased and deodorant-proof。
When you're done with waterproof, hairproofing, you're ready to put bricks。
In addition to normal tile attention, tile bubbles, dryness; and broken tiles left for cutting, i personally stress the overall beauty of the tiles. In short, the bricks on the wall cannot be less than 10 cm wide. This is often the case when the bricks are pasted, for example, one metre wide, 32 *32 cm bricks, normal stickers, 3 in one. However, 32 x 3 = 96, with one centimetre of suture space to be set aside, the last remaining brick will be only 3 cm wide. And it is not i who pickle, but a narrow brick is there, how ugly it is。
If you tell master wa in advance, the bricks on the wall cannot be less than 10 centimeters wide. He'll cut bricks on both sides. Again, to take the example of the wall just a metre wide, it becomes two wholes. 32 x 2 = 64, with a 1 cm stitch and 17. 5 cm each. In this way, it would appear that not only are symmetrical on both sides, but the whole wall would not have a narrow one that would be in the way。
However, this has been a costly exercise, and you are invited to buy the bricks before you are rich。
This should identify the water basin, the tap, and ask the cabinet designer for a second time. Come on
The purchase of paints (mixed or clean), wall paints, nitro paints, diluted water etc., etc., must also be made prior to a wallpaper okay
(vii) oilworkers in line, wash and wash
If you don't buy a door, let the master do it。
Caution: any carpentry work, even if it is just a poach, must follow this step, with a large pelt subsides, coated panels, and then paint. It's absolutely wrong to have irresponsible workers, lazy workers, brushing oil directly on a large coreboard when you're doing it. Don't believe the big cardboard bullshit. It's okay to paint it. Remember, just brush the oil, and it's not too long before it's all cracked up。
Now you're making oil, you don't brush it, you spray it. It would be better for workers to spray white on the inside side of the door and in the electric case, without waste。
There's nothing to say about painting walls. They're flat, they're grinding, they're rolling。
I don't paint anything but wallpaper. It is important to remind you that if you want to paint the walls, you must be careful that the colours are lighter than the colours, and you must not be the same or deeper than them, or you will regret it. The walls are painted at least twice, some three times more, and the colours on the walls go deeper than one layer。
As to whether paint is sprayed or rolled, those who are kind and those who are wise are wise. It's my house. It's not sprayed. The spray is said to have a better effect, but if the damage has to be painted, it will be difficult。
Wallpapers, beautiful walls
Wallpapers are much better than painting walls。
When the walls are painted, the oil unions do the nitro paints where they need them, so they can dry them up the next day, and then they can ask the master to paste them. I was worried that the wallpaper would stain the painted white wall, and it was only then that it became clear that the wallpaper was a very clean job. My fear was completely superfluous。
Note: do not open the window until 48 hours after the wallpaper is pasted, so it can dry slowly。
Say hello to master, if you're up somewhere, please help him fix it。
It's time to buy panels, plugs, lights
(ix) installation of plugin panels
The plug panels can be installed for about half a day。
Remind you:
1. Plugs are best bought with switches, especially in the kitchen, so that the electric cookers, microwave stoves are exempt from lifting power and can be controlled with switches。
2. Switches should be provided that they are practical. According to my observations, the five-hole power supply with the switch is flat, and once you need a three-barrel, there's a depression with an empty plug. So, use more plugs, even if it doesn't switch
At this point, a toilet kitchen hanger should be purchased fuck
At this point, if you need a bathing ring, buy and install it before the crane
(x) chef's hanger. Seal the last ugly part
The water heater and the bathhouse are first installed, and then the ceiling is sealed in order to improve the half-pack of the water heater, i. E., a more beautiful connection. Note:
1. It would be better to buy an aluminum button, even if it was not necessary to remove it after many years, and the sale of aluminum was valuable. Inversely, the pvc buttons are good, but the quality, the performance, and the plastic stuff can't be worth much, even for the scrap。
Buying a button, asking for the full price, not a button, and buying it on the sides. However, the cost of installation is separate。
(xi) installation of cupboards and birth of a beautiful whole kitchen
The cabinet is a collaborative project, which should have a smoker, stove and sink in advance. It would be better if it were delivered on the same day and installed with the cupboard。
In advance, tell the cupboard factory to bring the man-made table with the decomposition of the stove and the sink. A water table, a pipe or something. It's very useful。
(xii) installation of finished doors
The finished door should be installed before the floor, mainly because of the complexity of the door-filling process, the combination of pages, door locks, door suction, door frames, etc., and the numerous tools used, such as first flooring, which is difficult to avoid. My house is just a floor and a door, and there are lots of holes on the floor。
(xiii) installation of hangers, drapes, lamps, detergents, bathing hardware
It is recommended that these scattered items be completed before flooring is installed。
(xiv) floor installation
The floor must be flat before it's ready, and so many of my neighbor's floors are flat. I didn't know it was so depressing to walk down the aisle after the floor was laid. I had to take it off and get the powder and re-store it. Get a little pepper in advance, don't buy the floorers' so-called vermin powder and let them throw it along the kicks. Workers must not be asked to cut floors inside the house, to cut in the corridor, and finally to clean the corridor。
(xv) installation of radiators
At the end of the renovation, it is easier to be negligent. If the stamp is not on the installation list, it will not be signed。
Watch the dispenser's installation, (not the purchase order), who's the stamped part? Many of these operations are carried out in such a way that the purchase orders are stamped by the factory; the installation is stamped by the installation team. Thus, the so-called "povxxx" is merely a secured radiator per se, but either steel or copper aluminium on the material, and there is almost no quality problem as long as it is available. The easiest thing to do is install! If you agree with the stamp of the installation team, it's basically a waiver of the right to hold the factory accountable. In the event of an accident with a roof over the floor and a flooding of the home, the plant would be completely relieved of its responsibilities and it would be impossible for the installation team to find someone. The so-called quality assurance can only be borne by the user。
(xvi) cleaning of waste
The greatest manifestation of cleaning, i think, is cleaning glass. It's a scary thing to climb a building so high and wipe it out. The next one is waxing the floor, which is cheap and cheap, but which must be kept clean, which is dozens of times faster than manual。
The rest, i don't think, need to rely too much on cleaning, so they're scratching here with little blades, scratching there, not so spiritual。
So, after cleaning, it's best to do it again. Go to the supermarket and get a pack of five-clean powder and some old towels. With old towels and dry chalk, from the mouth to the door, from the tiles to the kicks, one house to the door, not to be lazy, it'll definitely make you proud。
(xvii) furniture, home electricity entry field
A new home, and the furniture is the first. Beds, mattresses, closets, shoe cabinets, sofas, table, etc。
Remind you that before the furniture enters the field, the following items should be prepared: one-time shoe sets (not to buy poor quality, to step on and break), boxes of activated charcoal, ladders, floor protective film (the best way to protect the floor is to move closets, television cabinets, etc.)。
If you buy a cloth bed, let's see if you can take it all down. Because i couldn't bear the electrostatic fibers, the next day i wanted to take off the original cloth and make a full set of cotton, and i found it too long and crucified into the bed box. Workers are lazy and think i won't break a condom for a year and a half. It is not clear whether this experience exists in the home, but the worker's master came back the next day and the dead bed was quite problematic. It's not too late for home electricity. It's getting better and cheaper
It tastes like home
With the decorative dots and beautiful curtains, the soft smell of the house came out。
And remind you that the curtains must not spend too much on dressing, and the curtains and lead crashes are the necessary money, but the eight and the ten dollars are extra, not necessary, and not good enough. I don't know。
Tragic workman: let's share it, guys and girls. I'm sure you're not far from building a house




