Question and answer of the energy-saving inspection
I. Filling out of the question (1 point, 10 points each)
1. The state implements a system of assessment and review of energy efficiency in fixed-asset investment projects, which do not meet (mandatory energy efficiency criteria) criteria, and the authority responsible for project approval or approval shall not authorize or approve construction。
2. Energy units should strengthen energy measurement management by equipping and using legally qualified (energy measuring devices) as required。
3. Energy efficiency inspections by energy efficiency inspection bodies shall be carried out in advance (3 working days) in writing to the inspected unit。
4. Energy-focused units should report annually to departments managing energy efficiency (state of energy use report)。
5. Energy-saving inspectors shall conduct energy-saving inspections not less than (2) and shall produce valid enforcement documents。
In terms of rational energy use, public corridors, stairs, etc. Of buildings should be installed and used (energy-efficient lighting)。
Enterprises in the main energy-consuming industries, such as electricity, iron and steel, non-ferrous metals, construction materials, oil processing, and chemicals, should establish (implement) national standards and industry standards for energy conservation in enterprises。
8. The national system for energy-intensive, energy-defunct products, equipment and production processes that are lagging behind (phase-out system)。
9. An energy production business shall not provide energy to its own employees (non-reimbursable)。
Energy units should be established (accountability for energy-saving objectives) to reward collective and individual achievements in energy-saving work。
Ii. Single selection (two points each, 20 points)
1. Which of the following acts is not an energy saving offence ()
A. Energy use in units above the energy consumption limit in units of products
B. Energy-saving services companies assist enterprises in energy conservation through reasonable measures
C. Production units producing energy-intensive products that have been explicitly phased out by countries
D. Energy production enterprises to provide energy to their employees free of charge
Answer: b

2. Energy-focused units should be established () to be employed among personnel with expertise in energy efficiency, practical experience and technical titles at the intermediate level and above, and to be reported to and documented by the departments and offices responsible for managing energy efficiency。
A. Energy-efficient management position b. Energy-efficient supervision position c. Energy-efficient technology position d. Energy-efficient security position
Answer: a
3. The energy-saving inspection body shall issue an energy-saving inspection opinion to the monitored unit within working days of the conclusion of the energy-saving inspection。
A. 5b. 7c. 10d. 15
Answer: c
4. According to the act on energy conservation, the state council and local governments at and above county level shall incorporate energy conservation efforts and organize the preparation and implementation of special medium- and long-term plans and annual energy conservation plans。
National economic and social development plan b. National energy development plan
C. Provincial regional energy development plans d. Municipal energy development plans
Answer: a
5. When on-site inspections are carried out by energy-saving inspection bodies, the inspected unit shall provide the relevant information and samples in good faith and shall not。
A. Concealing b. Delaying c. Rejection of d
Answer: d
6. The state encourages the use () production of construction materials, which should meet national standards。
A. Toxic and hazardous waste b. Toxic and harmless waste objects
C. Living waste d. Medical abandonment objects
Answer: b
7. The energy sources listed below are second-tier ()。
A. Coal b. Natural gas c. Petrol d. Hydropower
Answer: c
In industrial energy efficiency, energy efficiency in electrical systems is usually the focus, and the core of energy efficiency in electrical systems is ()。
A. Improving power efficiency b. Optimizing electric speed control
C. Reducing power losses above d
Answer: d
9. In cases where energy units are not equipped or are using energy measuring devices as required, the correction period shall be ordered; in the case of late correction, the fine shall be between $10,000 and $50,000。
A. Energy efficiency inspection agency b. Market supervision management
C. Sector d. Managing energy efficiency
Answer: b
10. Public institutions should give priority to the procurement of energy-efficient products, equipment, products included in the list of government procurement of equipment. The procurement of energy products and equipment that have been explicitly phased out by the state is prohibited. A list of government procurement of energy-efficient products and equipment is drawn up and published by () together with the relevant departments of the state council。
A. Department of state finance b. Department of state for managing energy efficiency
C. State council office d. State council development reform department
Answer: a
Iii. Multiple choices (2 points each, 20 points)
1. Elements of energy-saving monitoring include ()
A. Implementation of energy-saving laws, regulations, regulations and mandatory energy-saving standards in energy units
B. Implementation of energy consumption quotas in units of energy use
C. Implementation of energy efficiency management measures in energy units
D. Energy efficiency service activities carried out by energy efficiency services
Answer: abcd
2. The following are among the energy-saving measures ()
A. Energy efficiency through energy-efficient equipment b. Optimizing process processes
C. Enhancing energy management and developing energy-saving systems d. Integrated energy use
Answer: abcd
3. Obligations to be performed by energy-focused units: ()
A. Developing energy consumption statistics and energy use analysis systems
Regular energy audits
C. Implementation of energy-saving measures and adaptation of energy-saving technologies
D. Establishment of energy management posts with responsibility for energy management people
Answer: abcd
4. Measures that can be taken by energy-saving monitoring bodies are ()
A. Access to, and replication of, energy-saving-related information in monitored units
B. Monitoring energy use in energy-efficient equipment and production processes
C. Request for clarification from the monitored unit on relevant issues
D. Ordering the inspected unit to cease illegal use
Answer: abcd
5. The following are within the scope of industrial energy conservation: ()
Steel